While start up phase,
SRSCM will measure cross link of squibs. If one of them is failed during
interconnection test, then SRSCM will store interconnection fault. Once
the interconnection fault is detected, it remains active continuously till
the fault is erased. Only one fault code is assigned for all
interconnection fault.
| Terminal & Connector
Inspection |
Refer to the DESCRIPTION
in this TROUBLESHOOTING part.
| 1. |
PREPARATION
Refer to the DESCRIPTION in this
TROUBLESHOOTING part. |
| 2. |
CHECK SHORT CIRCUIT
| (1) |
Measure resistance between following
squibs.(DAB - PAB, DAB - SAB, DAB - CAB, DAB - BPT, DAB- BUPT,
PAB - SAB, PAB - CAB, PAB - BPT, PAB - BUPT, SAB - PAB, SAB -
CAB, SAB - BPT, SAB - BUPT, CAB - BPT, CAB - BUPT, BPT -
BUPT)
Specification (resistance) :
infinite
| |
| (2) |
Is the measured resistance within
specification?

▶ Go to next stetp.

▶ Repair or replace the wiring harness
between two
squibs. | |
| 3. |
CLEAR THE DTC AND CHECK THE VEHICLE
AGAIN
Refer to the DESCRIPTION in this
TROUBLESHOOTING
part. |