
The purpose of the
System Voltage is to detect an excessively low or high system voltage that
may be caused by a malfunctioning charging system.
System Voltage is the
ignition voltage potential at the Powertrain Control Module (PCM).PCM
measures and compares voltage from ignition key and each relay. With this
mechanism, PCM knows if the main relay switch turns on after IG on or if
turns OFF after IG off.
During engine running,
if battery voltage is below 11V, PCM sets P0562. MIL(Malfunction
Indication Lamp) turns on when the malfunction lasts till cosecutive 2
driving cycle.
Item
|
Detecting
Condition
|
Possible cause
|
DTC Strategy
|
|
|
Enable Conditions
|
| •
|
11V ≤ Battery voltage ≤
16V | |
Thresh old value
|
|
Diagnosis Time
|
|
MIL On Condition
|
|
Coil
Resistance
|
70Ω ~
120Ω
|

| 2. |
Connect Scantool and Engine
"ON" |
| 3. |
Monitor "Main Relay" parameter on Current
Data

|
| 4. |
Is the "Main Relay" parameter displayed
correctly ?

▶ Fault is intermittent caused by poor contact
in Sensor’s and/or PCM’s connector or was repaired and PCM memory
was not cleared. Thoroughly check connectors for looseness, poor
connection, bending, corrosion, contamination, deterioration, or
damage. Repair or replace as necessary and go to "Verification of
Vehicle Repair" procedure

▶ Go to "Terminal and Connector Inspection"
procedure. |
| TERMINAL AND CONNECTOR
INSPECTION |
| 1. |
Many malfunctions in the electrical system are
caused by poor harness and terminals. Faults can also be caused by
interference from other electrical systems, and mechanical or
chemical damage. |
| 2. |
Thoroughly check connectors for looseness,
poor connection, bending, corrosion, contamination, deterioration,
or damage. |
| 3. |
Has a problem been found?

▶ Repair as necessary and go to "Verification
of Vehicle Repair" procedure

▶ Go to " Power Circuit Inspection "
procedure. |
| 1. |
Power circuit inspection
| (2) |
Disconnect the main relay
connector. |
| (4) |
Measure the voltage between terminal 2
of main relay harness connector and chassis
ground. |
| (5) |
Measure the voltage between terminal 5
of main relay harness connector and chassis
ground.

|
| (6) |
Is the measured voltage within
specification ?

▶ Go to "Check open in harness"
procedure.

▶ Check the fuse between battery and
main relay.
▶ Repair Open or Short to ground in
power circuit and go to "Verification of Vehicle Repair"
procedure | |
| 2. |
Check open in harness
| (2) |
Disconnect main relay and PCM
connector. |
| (3) |
Measure the resistance between terminal
3 of main relay harness connector and terminals 38,40 of PCM
connector.
Specification : Approx. below
1Ω
|

|
| (4) |
Is the measured resistance within
specification ?

▶ Go to "Check short in harness"
procedure.

▶ Repair open in harness and go to
"Verification of Vehicle Repair" procedure
. | |
| 3. |
Check short in harness
| (2) |
Disconnect main relay and PCM
connector. |
| (3) |
Measure the resistance between terminal
3 of main relay harness connector and chassis
ground.

|
| (4) |
Is the measured resistance within
specification ?

▶ Go to "Control circuit inspection"
procedure.

▶ Repair short in harness and go to
"Verification of Vehicle Repair"
procedure. | |
| CONTROL CIRCUIT
INSPECTION |
| 1. |
Check short in harness
| (2) |
Disconnect main relay and PCM
connector. |
| (3) |
Measure the resistance between terminal
4 of main relay harness connector and chasses
ground.

|
| (4) |
Is the measured resistance within
specification ?

▶ Go to "Check open in harness"
procedure.

|
| (5) |
▶ Repair short in control harness and go
to "Verification of Vehicle Repair"
procedure. | |
| 2. |
Check open in harness
| (2) |
Disconnect main relay and PCM
connector. |
| (3) |
Measure the resistance between terminal
4 of main relay harness connector and terminal 43 of PCM
connector.
Specification : Approx. below
1Ω
|

|
| (4) |
Is the measured resistance within
specification ?

▶ Go to "Ground circuit inspection"
procedure.

▶ Repair Open in control harness and go
to "Verification of Vehicle Repair"
procedure. | |
| GROUND CIRCUIT
INSPECTION |
| 1. |
Open in circuit inspection
| (2) |
Disconnect PCM
connector. |
| (3) |
Measure the resistance between terminals
35,36 of PCM connector and chassis
ground. |
| (4) |
Measure the resistance between terminals
37,38,39 of PCM connector and chassis ground.
Specification : Approx. blow
1Ω
|

|
| (5) |
Is the measured resistance within
specification ?

▶ Go to "System inspection"
procedure.

▶ Repair Open in control harness and go
to "Verification of Vehicle Repair"
procedure. | |
| 1. |
Check Alternator circuit
| (2) |
Disconnect alternator
connector. |
| (4) |
Measure the voltage between terminal 2
of alternator and chassis
gound. |
| (5) |
Measure the voltage between terminal 3
of alternator and chassis gound.

|
| (6) |
Is the measured voltage within
specification?

▶ Go to "Component inspection"
procedure.

▶ In case terminal 2 : Repair MIL
circuit, MIL resistor or Open in circuit and go to
"Verification of Vehicle Repair" procedure.
▶ In case terminal 3 : Repair the fuse
between battery and Ignition switch, the fuse between Ignition
switch and alternator or Open in circuit and go to
"Verification of Vehicle Repair"
procedure. | |
| 1. |
Main relay inspection
| (2) |
Disconnect the main
relay. |
| (3) |
Measure the resistance between terminal
3 and 5 of main relay. |
| (4) |
Measure the resistance between terminal
2 and 4 of main relay.
Specification : 70 ~
120Ω
|
Terminal
|
Power approval
|
3 ~ 5
|
NO
|
2 ~ 4
|
YES (Approx. 70Ω ~
120Ω)
|

|
| (5) |
Is the measured resistance within
specification ?

▶ Substitute with a known - good PCM and
check for proper operation. If the problem is corrected,
replace PCM and go to "Verification of Vehicle Repair"
procedure.

▶ Substitute with a known - good Main
relay and check for proper operation. If the problem is
corrected, replace Main relay and go to "Verification of
Vehicle Repair" procedure.
|
There is a memory reset function
on scantool that can erase optional parts automatically
detected and memorized by PCM. After testing PCM on the
vehicle, use this function to reuse the PCM on the
others | | |
| VERIFICATION OF VEHICLE
REPAIR |
After a repair, it is
essential to verify that the fault has been corrected.
| 1. |
Monitor and record the Freeze Frame Data for
the Diagnostic Trouble Code(DTC) which has been
diagnosed. |
| 2. |
Using a Scantool, Clear the
DTCs |
| 3. |
Operate the vehicle within conditions noted in
the freeze frame data or enable
conditions |
| 4. |
Monitor that all rediness test have been
verified as " Complete " |
| 5. |
Are any DTCs present ?

▶ Go to the applicable troubleshoooting
procedure.

▶ System is performing to specification at
this
time. |