| 1. |
Measure the pressure of high pressure line by
measuring voltage output between NO.1 and NO.2
terminals.

|
| 2. |
Inspect the voltage value whether it is
sufficient to be regular value or not.

Voltage = 0.00878835 * Pressure + 0.5
[PSIA]
| |
| 3. |
If the measured voltage value is not
specification, replace the A/C pressure
transducer. |
| 1. |
Disconnect the negative (-) battery
terminal. |
| 2. |
Recover the refrigerant with a
recovery/charging station. |
| 3. |
Disconnect the A/C pressure transducer
connector (A) and then remove the A/C pressure transducer
(B).
Tightening
Torque :
10~12N.m (1.0~1.2kgf.m,
7.4~8.8lbf.ft)
|

|
Take care that liquid & suction pipe
are not
bent. | |
| 4. |
Installation is the reverse order of
removal. | |