Home › Automatic Transaxle System › Automatic Transaxle Control System › Inhibitor Switch

Automatic Transaxle Control System › Inhibitor Switch: Repair procedures

Inspection
•
Thoroughly check connectors for looseness, poor connection, bending, corrosion, contamination, deterioration, or damage.
Power Circuit Inspection
1.
Disconnect the Inhibitor swtich connector (A).
2.
Ignition KEY "ON"" & Engine "OFF".
3.
Measure voltge between supplied power and ground at inhibitor circuit.

Specification : Approx. 12V

Signal Circuit Inspection
1.
Connect the Inhibitor switch connector (A).
2.
Ignition KEY "ON" & Engine "OFF".
3.
Measure voltages between each terminal and chassis ground during shift lever changed "P, R, N, D".

Specification : See below "Inhibitor switch specification"

Signal Code Table

P
P-R
R
R-N
N
N-D
D
Signal 1
12V
12V
0
0
0
0
0
Signal 2
0
12V
12V
12V
0
0
0
Signal 3
0
0
0
12V
12V
12V
0
Signal 4
0
0
0
0
0
12V
12V

[Connection Information]

Removal
1.
Make sure vehicle does not roll before setting room side shift lever and Automatic Transaxle(AT) side manual control lever to "N" position.
2.
Remove the battery and the battery tray.
3.
Remove the air cleaner assembly.
4.
Remove the shift cable mounting nut (B).

Tightening torque:
9.8 ~ 14.7 N.m (1.0 ~ 1.5 kgf.m, 7.2 ~ 10.8 lb-ft)

5.
Disconnect the inhibitor switch connector (A).

6.
Remove the manual control lever (B) and the washer after removing a nut (A).

When installing, affix the manual control lever and the inhibitor switch with Ø5mm (0.1969in.). Then tighten the inhibitor assembly mounting bolts.
7.
Remove the inhibitor assembly (A) after removing the bolts (2ea).

Tightening torque:
9.8 ~ 11.8 N.m (1.0 ~ 1.2 kgf.m, 7.2 ~ 8.7 lb-ft)

When installing, tighten the inhibitor assembly mounting bolt lightly, so that necessary adjustments can be made. Tighten to specifications.
Installation
1.
Installation is the reverse of removal.