| INSPECTION AND ADJUSTMENT BEFORE
DISASSEMBLY |
Fix a brass
plate or aluminum plate for protection to the jaws of a vise and mount the
gear box in a vise.
When mounting the gear
box in a vise, let the installation section of it be fixed to the jaws. If
other section is fixed the gear box may be damaged.

TOTAL
PINION PRELOAD
| 1. |
Rotate the pinion gear for approximately 4
to 6 seconds for one rotation to measure the total pinion
preload.
|
Total pinion preload [Standard
value] |
|
0.6-1.3 Nm (6-13 kg.cm, 0.4-1.0
lb.ft) |
Measure the pinion preload through the
entire stroke of the rack. |

| 2. |
If the measured value is out of
specifications, first adjust the yoke plug, then recheck the total
pinion preload. |
| 3. |
If you adjust the yoke plug but do not
obtain the total pinion preload, check or replace the yoke plug
components |
TIE
ROD SWING RESISTANCE
| 1. |
Rotate the tie rod severely ten
times. |
| 2. |
Measure the tie rod swing resistance with a
spring scale.
|
Total rod swing resistance [Standard
value] |
|
8-22 N (1.9-4.6 lb) |
|
[2-5 Nm (20-50 kg.cm, 17-43
lb.in)] |
|
| 3. |
If the measured value exceeds the standard
value, replace the tie rod assembly.
Even if the measured value is below the
standard value, the tie rod that swings smoothly without excessive
play may be used. If the measured value is below 4.3 N (0.9 lb) [100
Ncm (8.7 lb.in.)], replace the tie
rod. |

BELLOWS
INSPECTION
| 1. |
Inspect the bellows for damage or
deterioration. |
| 2. |
Make sure the bellows are secured in the
correct position. |
| 3. |
If the bellows are defective, replace them
with new
ones. |