Home
›
Brake Systems
›
Anti-lock Brake System
›
Hydraulic and Electronic Control Unit
Anti-lock Brake System › Hydraulic and Electronic Control Unit: INSTALLATION
INSTALLATION
1.
Installation is the reverse of removal.
2.
Tighten the modulator mounting bolts and brake tube nuts to the specified torque.
Tightening torque
HECU mounting bolt : 8-10 Nm (80-100 kg·cm, 5.6-6.9 lb·ft)
Brake tube nut : 13-17 Nm (130-170 kg·cm, 9-12.5 lb·ft)