| 1. |
Remove the air intake hose
assembly(A).

|
| 2. |
Detach the power steering pressure hose
mounting clamp and the return tube mounting
clamp. |
| 3. |
Drain the power steering
fluid. |
| 4. |
Disconnect the pressure tube and the return
tube fittings from the gear box. |
| 5. |
Disconnect the shaft assembly(A) from the gear
box inside the passenger compartment.

|
| 6. |
Remove the strap and push out the dust cover
and remove the dust cover mounting
plate. |
| 8. |
Remove the front tires
(RH/LH). |
| 9. |
After removing the split pin, disconnect the
tie rod(A) from the knuckle(B) by using the special tool
(09568-31000).

|
| 10. |
Remove the stabilizer bar(A) (RH side)
mounting bracket(B).

|
| 11. |
Remove the front muffler
assembly(A).

|
| 12. |
Remove the mounting bolt and mounting clamp(A)
of power steering gear box, and also remove the clamp(B) holding the
pressure tube and the return tube.

|
| 13. |
Pull the power steering gear box assembly(A)
toward the right side of the vehicle.
|
When removing the gear box, pull it out
carefully and slowly so as not to cause damage to the
boots(B).

| |
| 1. |
Push in the power steering gear box
assembly(A) on the right side of the vehicle.

|
| 2. |
Install the dust cover mounting
plate. |
| 3. |
Connect the dust cover to its mounting plate
with a new strap. |
| 4. |
Connect the steering gear box assembly(A) to
the steering column shaft and universal joint
assembly(B).

|
| 5. |
Installation is the reverse of
removal. |
| 6. |
After installation, air bleed the
system. |
| 1. |
Remove the tie rod, end(B) from the tie
rod(A).

|
| 2. |
After mounting the tie rod end(A) in a vise,
remove the dust cover(B) from the ball joint.

|
| 3. |
Remove the bellows band(A).

|
| 4. |
Remove the bellows clip(A).

|
| 5. |
Pull the bellows out toward the tie
rod.
|
Check for rust on the rack when the
bellows are
replaced. | |
| 6. |
Remove the feed tube from the rack
housing. |
| 7. |
While moving the rack slowly, drain the fluid
from the rack housing. |
| 8. |
Unstake the tab washer(A) which fixes the tie
rod(B) and rack(C) with a chisel.

|
| 9. |
Remove the tie rod(B) from the
rack(C).
|
Remove the tie rod(B) from the rack(A),
taking care not to twist the rack.

| |
| 10. |
Remove the yoke plug locking
nut(A).

|
| 11. |
Remove the yoke plug(B) with a 14mm
socket(A).

|
| 12. |
Remove the lock nut(A), yoke plug(B), rack
support spring(C), rack support yoke(D) and bushing(E) from the gear
box.

|
| 13. |
Remove the valve body housing(A) by loosening
the two bolts(B).

|
| 14. |
Turn the rack stopper(A) clockwise until the
end of the circlip(B) comes out of the slot in the rack
housing(C).

|
| 15. |
When the end of the circlip(A) comes out of
the notched hole of the housing rack cylinder, turn the rack
stopper(B) counterclockwise and remove thecirclip(A).

|
| 16. |
Remove the O-ring(A) from the rack
bushing(B).

|
| 17. |
Remove the oil seal(A) from the rack
bushing(B).

|
| 18. |
Remove the valve body(A) from the valve body
housing(B) with a soft hammer(C).

|
| 19. |
Using the special tool, remove the oil seal
and ball bearing from the valve body
housing. |
| 20. |
Remove the oil seal and O-ring from the rack
housing.
|
Be careful not to damage the pinion
valve cylinder inside of the rack
housing. | |
| 21. |
Using the special tool(06573-21200,
09555-21000), remove the oil seal(A) from the rack
housing.
|
Be careful not to damage the rack
cylinder inside of the rack housing.

| |
| 1. |
Apply the specified fluid to the entire
surface of the rack oil seal.
Recommended fluid :
PSF-3
| |
| 2. |
Install the backup washer and oil seal(A) to
the specified position in the rack housing.

|
| 3. |
Apply the specified fluid to the entire
surface of the rack bushing oil seal.
Recommended fluid :
PSF-3
| |
| 4. |
Install the oil seal(A) in the rack
bushing(B).

|
| 5. |
Apply the specified fluid to the entire
surface of the O-ring and install it in the rack
bushing. |
| 6. |
Apply the specified grease to the rack
teeth.
Recommended
grease
Multipurpose grease SAE J310, NLGI
No.2
|
|
Do not plug the vent hole(A) in the rack
with grease.

| |
| 7. |
Insert the rack(A) into the rack housing(B)
and install the rack bushing(C) and rack stopper(D).

|
| 8. |
Push in the rack stopper until the circlip
groove of the rack stopper is aligned with the notched hole of the
rack housing. Install the circlip(A) while turning the rack
stopper.
|
The circlip end should not be visible
through the notched hole of the rack housing.

| |
| 9. |
Install the oil seal and the ball bearing in
the valve body(A).

|
| 10. |
After appling the specified fluid and grease
to the pinion valve assembly(A), install it in the rack housing
assembly.

|
| 11. |
After applying the specified fluid to the oil
seal, install it in the rack housing, and fix the valve body
assembly(A) and O-ring in the gear box(B).

|
| 12. |
Install the tab washer and the tie rod and
stake the tab washer(A) end at two points over the tie
rod.
| 1. |
Align the tab washer pawls with
the rack grooves. |
| 2. |
Always use a new tab
washer.

| | |
| 13. |
Install the bushing(A), rack support yoke(B),
rack support spring(C), lock nut(E) and yoke plug(D) in the order
shown in the illustration. Apply semi-drying sealantto the threaded
section of the yoke plug before installation.

|
| 14. |
With the rack placed in the center position,
attach the yoke plug to the rack housing. Tighten the yoke plug to
15 Nm (150 kg.cm, 11 lb.ft), using the special tool. Loosen the yoke
plug approximately from 30° to60° and tighten the locking nut to the
specified torque.
Tightening
torque
50~70 Nm (500~700 kg.cm, 37~52
lb.ft)
|

|
| 15. |
Tighten the feed tube to the specified torque
and install the mounting rubber using
adhesive. |
| 16. |
Apply the specified grease to the bellows
mounting position (fitting groove) of the tie rod.

|
| 17. |
Install the new attaching band to the
bellows.
|
When the bellows are installed, a new
band must be
used. | |
| 18. |
Install the bellows in position, taking care
not to twist it. |
| 19. |
Fill the dust cover inner side and lip with
the specified grease, and fix the dust cover in position with the
clip ring attached in the grooveof the tie rod end.
Recommended
greas
A : POLY LUB GLY 801K or
equivalent
B : SHOWA SUNLIGHT MB2 or
equivalent
Dust cover inner side and lip : THREE
BOND
|

|
| 20. |
Install the tie rods so that the length of the
left and right tie rods equals the standard value.
Standard
value
Tie rod free length :
204.5mm
|

|
| 21. |
Check for total pinion
preload. |
| INSPECTION AND ADJUSTMENT BEFORE
DISASSEMBLY |
|
When mounting the gear box in a vise, let the
installation section of it be fixed to the jaws. If other section is
fixed the gear box may be damaged.

|
TOTAL PINION PRELOAD
| 1. |
Rotate the pinion gear for approximately 4 to
6 seconds for one rotation to measure the total pinion
preload.
Standard
value
Total pinion preload :
0.6~1.3 Nm (6~13 kg.cm, 0.4~1.0
lb.ft)
|
|
Measure the pinion preload through the
entire stroke of the rack.

| |
| 2. |
If the measured value is out of
specifications, first adjust the yoke plug(A), then recheck the
total pinion preload. |
| 3. |
If you adjust the yoke plug but do not obtain
the total pinion preload, check or replace the yoke plug
components |
TIE ROD SWING RESISTANCE
| 1. |
Rotate the tie rod severely ten
times. |
| 2. |
Measure the tie rod(A) swing resistance with a
spring scale(B).
Standard
value
Total rod swing resistance
:
8-22 N (1.9-4.6 lb) [2-5 Nm (20-50
kg.cm, 17-43 lb.in)]
| |
| 3. |
If the measured value exceeds the standard
value, replace the tie rod assembly.
|
Even if the measured value is below the
standard value, the tie rod that swings smoothly without
excessive play may be used. If the measured value is below 4.3
N (0.9 lb) [100 Ncm (8.7 lb.in.)], replace the tie
rod. | |
BELLOWS INSPECTION
| 1. |
Inspect the bellows for damage or
deterioration. |
| 2. |
Make sure the bellows are secured in the
correct position. |
| 3. |
If the bellows are defective, replace them
with new ones. |
| INSPECTION AND ADJUSTMENT BEFORE
DISASSEMBLY |
|
When mounting the gear box in a vise, let the
installation section of it be fixed to the jaws. If other section is
fixed the gear box may be damaged.

|
TOTAL PINION PRELOAD
| 1. |
Rotate the pinion gear for approximately 4 to
6 seconds for one rotation to measure the total pinion
preload.
Standard
value
Total pinion preload :
0.6~1.3 Nm (6~13 kg.cm, 0.4~1.0
lb.ft)
|
|
Measure the pinion preload through the
entire stroke of the rack.

| |
| 2. |
If the measured value is out of
specifications, first adjust the yoke plug(A), then recheck the
total pinion preload. |
| 3. |
If you adjust the yoke plug but do not obtain
the total pinion preload, check or replace the yoke plug
components |
TIE ROD SWING RESISTANCE
| 1. |
Rotate the tie rod severely ten
times. |
| 2. |
Measure the tie rod(A) swing resistance with a
spring scale(B).
Standard
value
Total rod swing resistance
:
8-22 N (1.9-4.6 lb) [2-5 Nm (20-50
kg.cm, 17-43 lb.in)]
| |
| 3. |
If the measured value exceeds the standard
value, replace the tie rod assembly.
|
Even if the measured value is below the
standard value, the tie rod that swings smoothly without
excessive play may be used. If the measured value is below 4.3
N (0.9 lb) [100 Ncm (8.7 lb.in.)], replace the tie
rod. | |
BELLOWS INSPECTION
| 1. |
Inspect the bellows for damage or
deterioration. |
| 2. |
Make sure the bellows are secured in the
correct position. |
| 3. |
If the bellows are defective, replace them
with new
ones. | |