The Automatic
Transmission changes the gear position of the transmission by utilizing a
combination of Clutches and Brakes, which are controlled by solenoid
valves. The HIVEC Automatic Transmission consists of a: LR ( Low and
Reverse Brake ), 2-4 ( 2-4 Brake ), UD ( Under Drive Clutch ), OD ( Over
Drive Clutch ).
The PCM/TCM checks the
Low and Reverse Control Signal by monitoring the feedback signal from the
solenoid valve drive circuit. If an unexpected signal is monitored (for
example, high voltage is detected when low voltage is expected, or low
voltage is detected when high voltage is expected), the PCM/TCM judges
that the Low and Reverse control solenoid circuit is malfunctioning and
sets this code.
Item
|
Detecting
Condition
|
Possible Cause
|
Case 1
|
DTC
Strategy
|
|
| •
|
Open or short in
circuit |
| •
|
Faulty ON/OFF SOLENOID
VALVE |
|
Enable
Conditions
|
|
Threshold
Value
|
|
Case 2
|
DTC
Strategy
|
|
Enable
Conditions
|
| •
|
Time after TCM turns on 0.5
sec |
| •
|
Solenoid power voltage >10V and
<16V | |
Threshold
Value
|
| •
|
Feedback Voltage >battery
voltage-1V | |
Diagnostic Time
|
|
Fail Safe
|
|
Solenoid Valve for
Pressure Control
| - |
Sensor type : Normal open
3-way |
| - |
Operating temperature :
-30°C~130°C |
| - |
Frequency :PCSV-A,B,C,D :50Hz (at the ATF
temp. -20°C above)
VFS : 400~1000
※ KM series : 35Hz
|
| - |
Internal resistance : 3.5 ± 0.2
Ω(20°C) |
| Diagnostic Circuit
Diagram |


Fig 1) Wave form of
"ON/OFF(SCSV-A)"
| 1. |
Connect scantool to data link
connector(DLC) |
| 3. |
Monitor the "ON/OFF(SCSV-A) SOLENOID VALVE"
parameter on the GDS. |
| 4. |
Shift gear at each position.






Fig 1) "P,N"
Fig 2) "R"
Fig 3) "1st" gear
Fig 4) "2nd" gear
Fig 5) "3rd" gear
Fig 6) "4th"
gear |
| 5. |
Does "ON/OFF SOL VALVE" follow the referance
data?
|

|
▶ Fault is
intermittent caused by poor contact in the sensor's and/or
TCM(PCM)'s connector or was repaired and TCM(PCM) memory was
not cleared. Throughly check connectors for looseness, poor
connection, bending, corrosion, contamination, deterioration
or damage.Repair or replace as necessary and go to
"Verification Vehicle Repair" procedure.
|
|

|
▶ Go to
"W/Harness Inspection "
procedure.
|
|
| Terminal and Connector
Inspection |
| 1. |
Many malfunctions in the electrical system are
caused by poor harness and terminals. Faults can also be caused by
interference from other electrical systems, and mechanical or
chemical damage. |
| 2. |
Thoroughly check connectors for looseness,
poor connection, bending, corrosion, contamination, deterioration,
or damage. |
| 3. |
Has a problem been found?
|

|
▶ Repair as
necessary and go to "Verification vehicle Repair"
procedure.
|
|

|
▶ Go to
"Power Circuit Inspection"
procedure.
|
|
| 1. |
Connect "A/T SOLENOID VALVE" connector and
install device for measuring wave
form. |
| 2. |
Turn on the Engine and Drive in nomal
condition. |
| 3. |
Measure wave form between "ON/OFF(SCSV-A)
SOLENOID VALVE" teminal of the sensor harness connector and chassis
ground.
Wave form of ON/OFF
SOLENOID
|

|
| 4. |
Is measured normally operating wave
form?
|

|
▶ Go to
"Signal circuit inspection" procedure.
|
|

|
▶ Check for
open in harness. Repair as necessary and Go to "Verification
Vehicle Repair"
procedure.
|
|
| Signal Circuit
Inspection |
| 1. |
Check Signal Circuit Open
Inspection
| (2) |
Disconnect "A/T SOLENOID VALVE"
connector and "PCM/TCM"
connector. |
| (3) |
Measure resistance between
"ON/OFF(SCSV-A) SOLENOID VALVE" terminal of the ATM SOLENOID
VALVE harness connector and "ON/OFF(SCSV-A) SOLENOID VALVE"
terminal of the PCM/TCM harness connector.
Specification :
Approx. 0 Ω
| |
| (4) |
Is resistance within
specifications?
|

|
▶ Go
to "Check signal circuit short Inspection"
procedure.
|
|

|
▶
Check for open in harness. Repair as necessary and Go to
"Verification Vehicle Repair"
procedure.
|
| |
| 2. |
Check Signal Circuit Short
Inspection
| (2) |
Disconnect "A/T SOLENOID VALVE"
connector and "PCM/TCM"
connector. |
| (3) |
Measure resistance between "ON/OFF
SOLENOID V/V" terminal of the ATM SOLENOID VALVE harness and
chassis ground.
|
| (4) |
Is resistance within
specifications?
|

|
▶ Go
to "Component Inspection" procedure.
|
|

|
▶
Check for short to ground in harness. Repair as
necessary and Go to "Verification Vehicle Repair"
procedure.
|
| |
| 1. |
Check Solenoid Valve
| (2) |
Disconnect "A/T SOLENOID VALVE"
connector. |
| (3) |
Measure resistance between "ON/OFF
SOLENOID V/V" terminal and "Ground" terminal of the ATM
SOLENOID VALVE harness connector.
Specification :
Approximately 3.5 ± 0.2 Ω (25°C)
| |
| (4) |
Is resistance within
specifications?
|

|
▶ Go
to "CHECK PCM/TCM" as below.
|
|

|
▶
Replace ON/OFF SOLENOID VALVE as necessary and go to
"Verification Vehicle Repair"
procedure.
|
| |
| 2. |
Check PCM/PCM/TCM
| (1) |
Connect GDS to data link
connector(DLC) |
| (2) |
Ignition "ON" & Engine
"OFF". |
| (3) |
Select A/T Solenoide valve Actuator test
and Operate Actuator test. |
| (4) |
Is Actuator Testing performed normally
?

|

|
▶ Go
to "Verification Vehicle Repair"
procedure.
|
|

|
▶
Replace PCM/TCM as necessary and Go to "Verificaiton
Vehicle Repair"
procedure.
|
ACTUATOR TEST
CONDITION
1. IG SWITCH ON
2. TRANSAXLE RANGE SWITCH is
normal
3. P RANGE
4. Vehicle Speed 0km/h
5. Throttle position sensor<
1V
6. IDLE SWITCH ON
7. ENGINE RPM
0 | |
| Verification of Vehicle
Repair |
After a repair, it is
essential to verify that the fault has been corrected.
| 1. |
Connect scan tool and select "Diagnostic
Trouble Codes(DTCs)" mode. |
| 2. |
Using a scantool, Clear
DTC. |
| 3. |
Operate the vehicle within DTC Enable
conditions in General information. |
| 4. |
Are any DTCs present ?
|

|
▶ Go to the
applicable troubleshooting procedure.
|
|

|
▶ System
performing to specification at this
time.
|
|