| 1. |
Disconnect the vapor hose
(A). |
| 2. |
Remove the PCV valve (B).

|
| 1. |
Insert a thin stick (A) into the PCV valve (B)
from the threaded side to check that the plunger
movement.

|
If the plunger does not move (PCV valve
is clogged), clean or replace the valve.
| |
| 1. |
Installation is reverse of
removal.
PCV Valve
installation:
1.96 ~ 2.94 N.m (0.2 ~ 0.3 kgf.m, 1.45 ~
2.17 lb-ft)
| | |