| 1. |
Remove the following items;
| B. |
Air cleaner assembly and air duct.
|
| C. |
Battery and battery tray.
| |
| 2. |
Set shift lever to N
position. |
| 3. |
Separate the control cable from the control
shaft after remove the pin (A) and washer (B).

|
| 4. |
Remove the control shaft assembly after loosen
the bolts.
Tightening
torque:
19.6 ~ 26.5 N.m (2.0 ~ 2.7 kgf.m,14.5 ~
19.5 lb-ft)
|

|
| 1. |
Installation is the reverse of removal.
| •
|
When installing, set control shaft
lever to neutral position.

|
| •
|
When installing, apply the sealant
as shown in the illustration.
Specified sealant
: MS 721-40 or
MS721-38
|

| | |
| 2. |
After installing, check to be sure that this
part operates as designed at each range of T/M side corresponding to
each position of shift lever.
| |