Operating Logic Test (Manual only)
Inspect the PTC
operation with the confirmation logic below :
| 1. |
Entering
| (1) |
Set the Floor mode and maximum heating
position. |
| (2) |
Turn off the blower
switch. |
| (3) |
Press the intake(recirculation) button 5
times or more. |
| (4) |
The intake and A/C button indicator will
continuously flash with an interval of 0.5
seconds. |
| (5) |
Confirm the PTC operation by turning on
the blower switch. |
| (6) |
Each PTC relay is operated with an
interval of 3 seconds. |
| (7) |
The logic test will automatically cancel
after 30 seconds.
In addition, it can be cancelled by
doing the followings :
| A. |
Select A/C or intake
(recirculation) switch |
| |
| 2. |
Cancellation
| A. |
Select A/C or intake (recirculation)
switch. |
| B. |
Turn the ignition switch
OFF. |
| C. |
The test cancels automatically after 30
seconds. | |
| 3. |
If the PTC does not operate, substitute with a
known-good PTC heater and check for proper operation.
If the problem is corrected, replace the PTC
heater. |
Operating Test
This test should be
performed in the PTC ON conditions.
| 2. |
Check the current on the wiring with a clamp
multi tester.
Pattern
|
Current
(A)
|
PTC
ON
|
12 ~
32
|
Total
|
12 ~
32
|
|
| 3. |
If the current is not within specification,
inspect the related wiring. |
Resistance Test
| 1. |
Turn the ignition switch
OFF. |
| 2. |
Disconnect the PTC heater
connector. |
| 3. |
Measure the resistance between terminal 1 and
PTC ON (+) of PTC heater and ground line.

|
| 4. |
If the measured resistance is not within
specification, replace the PTC heater with a new
one. |
| 1. |
Disconnect the negative (-) battery
terminal. |
| 2. |
Remove the crash pad lower panel.
|
| 3. |
Remove the knee airbag module.
|
| 4. |
Remove the driver side shower duct (A) after
loosening the screw.

|
| 5. |
Disconnect the PTC heater connector
(A).

|
| 6. |
Remove the PTC heater core (A) after loosening
the PTC heater mounting screws.

|
| 7. |
Install in the reverse order of removal.
|