| 1. |
Remove the cylinder head cover.
(Refer to Cylinder Head Assembly - "Cylinder
Head Cover") |
| 2. |
Set No.1 cylinder to TDC (Top dead center) on
compression stroke.
| (1) |
Turn the crankshaft pulley and align its
groove with the timing mark of the timing chain
cover.

|
| (2) |
Check that the TDC marks of the intake
and exhaust CVVT sprockets are in straight line on the
cylinder head surface as shown in the illustration. If not,
turn the crankshaft by one revolution (360°)
more.

|
Do not turn the crankshaft pulley
counterclockwise.
| | |
| 3. |
Remove the timing chain cover.
(Refer to Timing System - "Timing Chain
Cover") |
| 4. |
Remove the timing chain tensioner
(A).

| •
|
Do not reuse the detached
tensioner. |
| •
|
If need to reuse the tensioner,
remove the tensioner, make the piston (A) to protrude
maximally, push the piston (A) to the end, and then
mount the stopper pin.
At this time, the tensioner fixing
pin should be placed in the same way as when the product
was first delivered from the
factory. | |


|
| 5. |
Remove the timing chain tensioner arm (A).

|
| 6. |
Remove the timing chain (A).

|
| 7. |
Remove the timing chain guide
(A).

|
Sprockets, Chain Tensioner, Chain Guide, Chain
Tensioner Arm
| 1. |
Check the CVVT sprocket and crankshaft
sprocket for abnormal wear, cracks, or damage. Replace if necessary.
|
| 2. |
Inspect the tensioner arm and chain guide for
abnormal wear, cracks, or damage. Replace if necessary.
|
| 3. |
Check that the tensioner piston moves
smoothly. |
| 1. |
The TDC marks of the intake and exhaust CVVT
sprockets are slightly turned from the TDC position as shown when
the timing chain is removed.

|
| 2. |
Turn the crankshaft clockwise (about 2~3
pitches) from the TDC position (the dowel pin (A) of crankshaft is
about 3° with the engine vertical line) as rotation of the intake
CVVT sprocket from the TDC position.

|
| 3. |
Install the timing chain guide
(A).
Tightening
torque:
18.6 ~ 22.6 N.m (1.9 ~ 2.3 kgf.m, 13.7 ~
16.6 lb-ft)
|

|
| 4. |
Install the timing chain tensioner arm
(A).
Tightening
torque:
18.6 ~ 22.6 N.m (1.9 ~ 2.3 kgf.m, 13.7 ~
16.6 lb-ft)
|

|
| 5. |
Install the timing chain.
Crankshaft sprocket (A) → Timing chain guide
(B) → Intake CVVT sprocket (C) → Exhaust CVVT sprocket
(D)
| (1) |
Install the timing chain with no slack
between the crankshaft sprocket and the intake CVVT
sprocket.

|
The timing marks of each sprocket
should be matched with timing marks (color link) of
timing chain when installing the timing chain.
| |
| (2) |
Install the timing chain on the exhaust
CVVT sprocket with no slack while turning the CVVT assembly
clockwise.

| • |
The timing mark of the
exhaust CVVT sprocket should be matched with
timing mark (color link) of timing chain when
installing the timing chain.
|
| • |
Press down the timing chain
links on the exhaust CVVT sprocket to prevent the
sprocket from
spinning. | | | |
| 6. |
Install the timing chain auto tensioner (A)
and remove the stopper pin (B).
Tightening
torque:
9.8 ~ 11.8 N.m (1.0 ~ 1.2 kgf.m, 7.2 ~
8.7 lb-ft)
|

| •
|
When reinstall the tensioner,
check the ratchet function of the tensioner after
removing the fixing pin by retracting the tensioner arm
(A) maximally as shown below.
|
| •
|
When maximally retracted, there
should be no interference between the tensioner arm (A)
and tensioner housing
(B). | |

|
| 7. |
After rotating crankshaft 2 revolutions in
regular direction (clockwise viewed from front), confirm that the
TDC marks on the intake and exhaust CVVT sprockets are aligned with
the top surface of cylinder head.

|
| 8. |
Install the other parts reverse order of
removal. |
| 9. |
Add all the necessary fluids and check for
leaks. Connect GDS. Check for codes, note, and clear.
Recheck.
| •
|
Refill engine with engine
oil. |
| •
|
Clean battery posts and cable
terminals and assemble.
|
| •
|
Inspect for fuel
leakage. |
| -
|
After assembling the fuel line,
turn on the ignition switch (do not operate the starter)
so that the fuel pump runs for approximately two seconds
and fuel line
pressurizes. |
| -
|
Repeat this operation two or three
times, then check for fuel leakage at any point in the
fuel
line. | | |