|
If the OCVs are installed incorrectly, the
vehicle may be damaged.
So when installing them, ensure the OCV and
harness connector colors match(Components and harness
side). |
[Bank and its color]
Bank
|
Component side
|
Harness side
|
Bank 1
(RH)
|
Grey
|
Grey
|
Bank 2
(LH)
|
Black
|
Black
|
The Continuously
Variable Valve Timing (CVVT) system controls the amount of valve overlap
by varying the amount of oil flow into an assembly mounted on each intake
camshaft through PCM control of an oil control valve. This system uses two
oil control valves, one on each bank. An Oil Temperature Sensor (OTS) is
used to allow PCM monitoring of engine oil temperature. As oil is directed
into the chambers of the CVVT assembly, the cam phase is changed to suit
various performance and emissions requirements..
| 1. |
When camshaft rotates engine rotation-wise:
Intake-Advance / Exhaust-Retard |
| 2. |
When camshaft rotates counter engine
rotation-wise: Intake- Retard / Exhaust-
Advance |

SPECIFICATION
Item
|
Specification
|
Coil
Resistance (Ω)
|
6.7 ~ 7.7Ω
at 20°C (68°F)
|

COMPONENT INSPECTION
| 1. |
Turn ignition switch
OFF. |
| 2. |
Disconnect OCV
connector. |
| 3. |
Measure resistance between OCV terminals 1 and
2.

|
| 4. |
Check that the resistance is within the
specification.
Specification: Refer to
SPECIFICATION.
| |