
The HIVEC Automaic
Transmission supplies the power to the solenoid valves by way of a control
relay. When the TCM(PCM) sets the relay to ON, the relay operates and the
battery power is supplied to all the solenoid valves. When the TCM(PCM)
sets the relay to OFF, all solenoid valve power is shut off and the
transmission is held in the 3rd gear position. (Fail Safe
Mode)
The TCM(PCM) checks
the A/T control relay signal by monitoring the control signal. If, after
the iginiton key is turned on, an unexpected voltage value, which is quite
a bit lower than battery voltage is detected, the TCM(PCM) sets this
code.
Item
|
Detecting Condition &
Fail Safe
|
Possible
cause
|
DTC Strategy
|
|
| •
|
Open or short in
circuit |
| •
|
Faulty A/T control
relay |
|
Enable
Conditions
|
| •
|
22V > Voltage Battery
>9V |
| •
|
Time after TCM(PCM) turns on
>0.5sec | |
Threshold
value
|
| •
|
Voltage < 7V orVoltage >
24.5V | |
Diagnostic
Time
|
|
Fail Safe
|
| •
|
Locked in 3rd gear.(Control relay
off) | |

| 1. |
Connect scantool to data link
connector(DLC). |
| 2. |
Ignition "ON" & Engine
"OFF". |
| 3. |
Monitor the "A/T CON. RELAY VOLT" parameter
on the scantool.
Specification : Approx.
B+
|

|
| 4. |
Is A/T RELAY VOLT within
specifications?

▶ Fault is intermittent caused by poor
contact in the relay's and/or TCM(PCM)'s connector or was repaired
and TCM(PCM) memory was not cleared. Thoroughly check connectors for
looseness, poor connection, bending, corrosion, contamination,
deterioration or damage. Repair or replace as necessary and go to
"Verification of Vehicle Repair" procedure.

▶ Go to "Terminal & Connector
Inspection" procedure. |
| TERMINAL & CONNECTOR
INSPECTION |
| 1. |
Many malfunctions in the electrical system
are caused by poor harness and terminals. Faults can also be caused
by interference from other electrical systems, and mechanical or
chemical damage. |
| 2. |
Thoroughly check connectors for looseness,
poor connection, bending, corrosion, contamination, deterioration,
or damage. |
| 3. |
Has a problem been found?

▶ Repair as necessary and then go to
"Verification of Vehicle Repair" procedure.

▶ Go to "Power Supply circuit inspection"
procedure. |
| POWER SUPPLY CIRCUIT
INSPECTION |
| 1. |
Ignition "ON" & Engine
"OFF". |
| 2. |
Disconnect the "A/T CONTROL RELAY"
connector. |
| 3. |
Measure the voltage between terminal "1" of
the "A/T CONTROL RELAY" harness connector and chassis
ground.
Specification : Approx.
B+
|

|
| 4. |
Is voltage within
specifications?

▶ Go to "Signal circuit inspection"
procedure.

▶ Check that A/T-30A Fuse in engine room
junction is installed or not blown.
▶ Check for Open in harness. Repair as
necessary and go to "Verification of Vehicle Repair"
procedure. |
| SIGNAL CIRCUIT
INSPECTION |
| 1. |
CHECK A/T control relay harness
| (2) |
Disconnect the "A/T CONTROL RELAY"
connector. |
| (3) |
Measure the voltage between terminal
"4" of the "A/T CONTROL RELAY" harness connector and chassis
ground. |
| (4) |
Turn ignition switch OFF →
ON.
Specification: 12V is measured
only for approx. 0.5sec
|

|
| (5) |
Is voltage within
specifications?

▶ Go to "Check Supplying Power to
solenoid valve" procedure.

▶ Check for open in harness. Repair as
necessary and go to "Verification of Vehicle Repair"
procedure
▶ If signal circuit is OK, Substitute
with a known-good TCM(PCM) and check for proper operation. If
the problem is corrected, replace TCM(PCM) and then go to
"Verification of Vehicle Repair"
procedure. | |
| 2. |
CHECK Supplying Power to solenoid valve
harness
| (2) |
Disconnect the "A/T CONTROL RELAY" and
TCM(PCM) connector. |
| (3) |
Measure the resistance between
terminal "3" of the "A/T CONTROL RELAY" harness connector and
terminal "49/50" of the TCM(PCM) harness
connector
Specification : Approx. 0
Ω
|

|
| (4) |
Is resistance within
specifications?

▶ Go to "Ground circuit inspection"
procedure.

▶ Check for Open in JE01 joint
connector.
▶ Check for open in harness. Repair as
necessary and go to "Verification of Vehicle Repair"
procedure. | |
| GROUND CIRCUIT
INSPECTION |
| 2. |
Connect the "A/T CONTROL RELAY"
connector. |
| 3. |
Measure the resistance between terminal "2"
of the "A/T CONTROL RELAY" harness connector and chassis
ground.
Specification : Approx. 0
Ω
|

|
| 4. |
Is resistance within
specifications?

▶ Go to "Component inspection"
procedure.

▶ Check for open in harness. Repair as
necessary and go to "Verification of Vehicle Repair"
procedure. |
| 2. |
Remove "A/T CONTROL
RELAY" |
| 3. |
Measure the resistance between each terminal
of the sensor.
Specification: Shown
below
|
Item
|
Terminal No
|
Resistance
|
1(red) - 3(pink)
|
INFINITE
|
2(black) - 4(pink)
|
|
supply(B+) to number 4 and supply (B-) to number
2.
|
1(red) - 3(pink)
|
0
Ω
|
|
| 4. |
Is resistance within
specification?

▶ Thoroughly check connectors for looseness,
poor connection, bending, corrosion, contamination, deterioration,
or damage. Repair or replace as necessary and then go to
"Verification of Vehicle Repair" procedure.

▶ Replace ATM CONTROL RELAY and then go to
"Verification of Vehicle Repair"
procedure. |
| VERIFICATION OF VEHICLE
REPAIR |
After a repair, it is
essential to verify that the fault has been corrected.
| 1. |
Connect scan tool and select "Diagnostic
Trouble Codes(DTCs)" mode. |
| 2. |
Using a scantool, Clear
DTC. |
| 3. |
Operate the vehicle within DTC Enable
conditions in General information. |
| 4. |
Are any DTCs present ?

▶ Go to the applicable troubleshooting
procedure.

▶ System performing to specification at this
time. |