
One terminal of main
relay is connected to battery and the other terminal which is ground point
is conneted to PCM. PCM monitors the voltages flowing into main relay and
going through it.
Checking the contolling
state of main relay every 10 sec. under detecting condition, if open or
short in the circuit is detected for more than 5 sec., PCM sets
P0685.
Item
|
Detecting
Condition
|
Possible cause
|
DTC
Strategy
|
| •
|
Detects a short to ground, to battery or
open circuit on Main Relay output Fault information provided
by an output driver chip. | |
| •
|
Open or short in control
circuit. |
|
EnableConditions
|
| •
|
11V ≤ Ignition Voltage ≤
16V |
| •
|
Enable Time delay ≥
0.5sec. | |
Threshold
value
|
|
DiagnosisTime
|
| •
|
Contineous
(More than 5sec. Failure for every 10
sec. test) | |
MIL On
Condition
|
|
Coil
Resistance
|
70Ω ~
120Ω
|

| 1. |
Connect scantool to DLC(Data Link
Connector) |
| 2. |
Warm up the engine to normal operating
temperature. |
| 3. |
Monitor "Main Relay" parameter on
scantool.

|
| 4. |
Is the "Main Relay" parameter displayed
correctly ?

▶ Fault is intermittent caused by poor contact
in Sensor’s and/or PCM’s connector or was repaired and PCM memory
was not cleared. Thoroughly check connectors for looseness, poor
connection, bending, corrosion, contamination, deterioration, or
damage. Repair or replace as necessary and go to "Verification of
Vehicle Repair" procedure

▶ Go to "Terminal and Connector Inspection"
procedure. |
| TERMINAL AND CONNECTOR
INSPECTION |
| 1. |
Many malfunctions in the electrical system are
caused by poor harness and terminals. Faults can also be caused by
interference from other electrical systems, and mechanical or
chemical damage. |
| 2. |
Thoroughly check connectors for looseness,
poor connection, bending, corrosion, contamination, deterioration,
or damage. |
| 3. |
Has a problem been found?

▶ Repair as necessary and go to "Verification
of Vehicle Repair" procedure

▶ Go to " Power Circuit Inspection "
procedure. |
| 4. |
Measure voltage between harness terminal 2 of
Main Relay and chassis ground. |
| 5. |
Measure voltage between harness terminal 5 of
Main Relay and chassis ground.

|
| 6. |
Is the measured voltage within specification
?

▶ Go to "Control Circuit Inspecition"
procedure.

▶ Check fuse between battery and main relay is
disconnected.
▶ Repair or replace open or short in harness
and then go to "Verification of Vehicle Repair"
procedure. |
| CONTROL CIRCUIT
INSPECTION |
| 1. |
Check short in coil control
| (2) |
Disconnect Main Relay and PCM
connector. |
| (3) |
Measure resistance between harness
terminal 4 and chassis
ground. |
| (4) |
Measure resistance between harness
terminal 4 and 5 of Main Relay.

|
| (5) |
Is the measured resistance within
specification ?

▶ Go to "Check open in coil control" as
follows.

▶ Repair or replace as necessary and
then go to " Verification of Vehicle Repair"
procedure. | |
| 2. |
Check open in coil control
| (2) |
Disconnect Main Relay and PCM
connector. |
| (3) |
Measure resistance between harness
terminal 4 of Main Relay and harness terminal 43/C144-1 of PCM
harness connector.
Specification : Approx. below
1Ω
|

|
| (4) |
Is the measured resistance within
specifications ?

▶ Go to "Component Inspection"
procedure.

▶ Repair or replace as necessary and
then, go to "Verification of Vehicle Repair"
procedure. | |
| 1. |
Check Main Relay
| (2) |
Disconnect Main
Relay |
| (3) |
Measure resistance between terminal 5
and 3 of Main Relay |
| (4) |
Measure resistance between terminal 4
and 2 of Main Relay.
Specification :
Terminal
|
continuity
|
3 ~ 5
|
NO
|
2 ~ 4
|
YES (Approx. 70Ω ~
120Ω)
|

|
| (5) |
Is the measured reisistance within
specification ?

▶ Substitute with a known - good PCM and
check for proper operation.
If the problem is corrected, replace PCM
and go to "Verification of Vehicle Repair"
procedure.
|
There is a memory reset function
on scantool that can erase optional parts automatically
detected and memorized by
PCM. |

▶ Substitute with a known - good Main
Relay and check for proper operation.
If the problem is corrected, replace
Main Relay and go to "Verification of Vehicle
Repair"procedure. | |
| VERIFICATION OF VEHICLE
REPAIR |
After a repair, it is
essential to verify that the fault has been corrected.
| 1. |
Monitor and record the Freeze Frame Data for
the Diagnostic Trouble Code(DTC) which has been
diagnosed. |
| 2. |
Using a Scantool, Clear the
DTCs |
| 3. |
Operate the vehicle within conditions noted in
the freeze frame data or enable
conditions |
| 4. |
Monitor that all rediness test have been
verified as " Complete " |
| 5. |
Are any DTCs present ?

▶ Go to the applicable troubleshoooting
procedure.

▶ System is performing to specification at
this
time. |