PCM controls OCV(Oil
Contol Valve) with PWM (Pulse Width Modulator) signal to change oil
passages supplying oil to CVVT that makes CAM postion changes (advance or
retard). OCV is integrated with oil filter and located at the nearest CVVT
on the engine block.
The oil control valve is
commanded by a pulse-width-modulated signal from the engine control unit.
A duty cycle of zero commands the cam phaser to its default position. A
duty cycle of 100% commands the phaser to its maximum phased position.
When the phaser must be controlled to an intermediate position, the duty
cycle is maintained in the region of the 'hold position'. This is a medium
duty cycle, usually between 35% and 65%, depending on temperature and
voltage conditions. As the cam phaser is advanced and retarded, its
position is measured using a toothed wheel.
The wheel is attached to
the camshaft, or to the cam phaser rotor. A sensor picks up the signal
from the wheel and its output is read by the engine control unit. A cam
signal is generated for each cam phaser on the engine. This requires a
separate toothed wheel and cam sensor combination for each cam phaser. The
cam signal and crankwheel signal are compared as the engine turns, and the
phasing position is determined. The position is displayed in crank angle
degrees, relative position from default. This position measurement is used
as feedback for the position control software, which determines the
required percent duty cycle commanded to the oil control
valve.
When the enable
condition is satisfied The PCM checks that high and low outputs (Voltage
level) are observed when OCVs are commanded. When a OCV output failure is
detected, the appropriate fail counter is incremented.
If the failure threshold
is exceeded 5 seconds during one diagnostic test(10second), the test is
failed and DTC is stored. MIL(Malfunction Indicatin Lamp) turns on when
the malfunction lasts till consecutive 2 driving cycle.
Item
|
Detecting
Condition
|
Possible cause
|
DTC Strategy
|
| •
|
Detects a short to ground or open
circuit of VCPD Bank 1 Intake circuit
output | |
| •
|
Open or short to ground in control
circuit |
|
Enable Conditions
|
| •
|
No disabling Faults
Present |
| •
|
11V ≤ Ignition Voltage ≤
16V |
| •
|
Enable Time delay ≥
0.5sec | |
Threshold value
|
| •
|
Short to ground or open
circuit | |
Diagnosis Time
|
| •
|
Continuous
(More than 5 seconds failure for every
10 seconds test ) | |
MIL On Condition
|
|

The oil control valve is
commanded by a pulse-width-modulated signal from the engine control unit.
A duty cycle of zero commands the cam phaser to its default position. A
duty cycle of 100% commands the phaser to its maximum phased position.
When the phaser must be controlled to an intermediate position, the duty
cycle is maintained in the region of the ‘hold position’. This is a medium
duty cycle, usually between 35% and 65%, depending on temperature and
voltage conditions.

| 1. |
IG "OFF" & connect
scantool. |
| 2. |
ENG "ON" and warm -up the engine to normal
operating temperature. |
| 3. |
Monitor "Cam Duty1, Cam Desired Position and
Cam Actual Position" on the service data.

|
| 4. |
Are the "CAM" data displayed correctly
?

▶ Fault is intermittent caused by poor contact
in the sensor’s and/or PCM’s connector or was repaired and PCM
memory was not cleared. Thoroughly check connectors for looseness,
poor connection, ending, corrosion, contamination, deterioration, or
damage. Repair or replace as necessary and go to "Verification of
Vehicle Repair" procedure

▶ Go to "Terminal and Connector Inspection"
procedure |
| TERMINAL AND CONNECTOR
INSPECTION |
| 1. |
Many malfunctions in the electrical system are
caused by poor harness and terminals.
Faults can also be caused by interference from
other electrical systems, and mechanical or chemical
damage. |
| 2. |
Thoroughly check connectors for looseness,
poor connection, bending, corrosion, contamination, deterioration,
or damage. |
| 3. |
Has a problem been found?

▶ Repair as necessary and go to "Verification
of Vehicle Repair" procedure

▶ Go to " Power Circuit Inspection "
procedure |
| 1. |
IG "OFF" & Disconnect OCV(B1)
connector. |
| 3. |
Measure voltage between terminal 1 of OCV(B1)
harness connector and chassis ground.

|
| 4. |
Is the measured voltage within specification
?

▶ Go to "Control Circuit Inspection"
procedure.

▶ Check fuse between Main Relay and OCV is
open or not installed.
▶ Check open in power circuit between Main
Relay and OCV power circuit.
▶ Repair or repalce as necessary and then go
to "Verification of Vehicle Repair"
procedure. |
| CONTROL CIRCUIT
INSPECTION |
| 1. |
Check short to ground in harness.
| (1) |
IG "OFF" and disconnect OCV
connector. |
| (3) |
Measure resistance between terminal 2 of
OCV harness connector and chassis ground.

|
| (4) |
Is the measured resistance within
specification ?

▶ Go to "Check open in harness" as
follows

▶ Repair or replace as necessary and go
to "Verification of Vehicle Repair"
procedure. | |
| 2. |
Check open in harness
| (1) |
IG "OFF" and disconnect OCV and PCM
connector. |
| (2) |
Measure resistance between terminal 2 of
OCV harness connector and terminal 62 of PCM harness
connector.
Specification : Approx. below
1Ω
|

|
| (3) |
Is the measured resistance within
specification ?

▶ Go to "Component Inspection"
procedure.

|
| (4) |
▶ Repair or replace as necessary and go
to "Verification of Vehicle Repair"
procedure. | |
| 1. |
Check OCV
| (1) |
IG "OFF" and disconnect OCV
connector. |
| (2) |
Measure resistance between terminal 1
and 2 of OCV. (Component Side)
Specification :

|
| (3) |
Is the measured resistance within
specification ?

▶ Go to "OCV Actuation Test" as
follows.

▶ Substitute with a known - good OCV and
check for proper operation. If the problem is corrected,
replace OCV and go to "Verification of Vehicle Repair"
procedure. | |
| 2. |
OCV Actuation Test
| (1) |
Connect scantool and IG
"ON". |
| (2) |
Select "OCV" on the Actuation
Test. |
| (3) |
Activates "OCV" by pressing "STRT(F1)"
key.
(should hear a faint click from Oil
Control solenoid Valve) |
| (4) |
Repeat this procedure 4 or 5 times to
ensure intake valve control solenoid reliability

|
| (5) |
Does OCV generate clik sound during
acutation test ?

▶ Substitute with a known - good PCM and
check for proper operation. If the problem is corrected,
replace PCM and go to "Verification of Vehicle Repair"
procedure.
|
There is a memory reset function
on scantool that can erase optional parts automatically
detected and memorized by PCM.
Before or after testing PCM on the
vehicle, use this function to reuse the PCM on the
others |

▶ Substitute with a known - good OCV and
check for proper operation. If the problem is corrected,
replace OCV and go to "Verification of Vehicle Repair"
procedure. | |
| VERIFICATION OF VEHICLE
REPAIR |
After a repair, it is
essential to verify that the fault has been corrected.
| 1. |
Monitor and record the Freeze Frame Data for
the Diagnostic Trouble Code(DTC) which has been
diagnosed. |
| 2. |
Using a Scantool, Clear the
DTCs |
| 3. |
Operate the vehicle within conditions noted in
the freeze frame data or enable
conditions |
| 4. |
Monitor that all rediness test have been
verified as " Complete " |
| 5. |
Are any DTCs present ?

▶ Go to the applicable troubleshoooting
procedure.

▶ System is performing to specification at
this
time. |