The HIVEC Automaic
Transmission supplies the power to the solenoid valves by way of a control
relay. When the TCM sets the relay to ON, the relay operates and the
battery power is supplied to all the sonenoid valves. When the TCM sets
the relay to OFF, all solenoid valve power is shut off and the
transmission is held in the 3rd gear position. (Fail Safe Mode
)
The TCM checks the A/T
control relay signal by monitoring the contol signal. If, after the
iginiton key is turned on, an unexpected voltage value, which is quite a
bit lower than battery voltage is detected, the TCM sets this
code.
Item
|
Detecting
Condition
|
Possible
Cause
|
DTC
Strategy
|
|
| •
|
Open or short in
circuit |
| •
|
Faulty A/T control
relay |
|
Enable
Conditions
|
| •
|
22V > Voltage Battery
>9V |
| •
|
Time after TCM turns on
>0.5sec | |
Threshold
Value
|
| •
|
Voltage <7V orVoltage >
24.5V | |
Diagnostic
Time
|
|
Fail Safe
|
| •
|
Locked in 3 rd gear.(control relay
off) | |
| 1. |
Connect scantool to data link
connector(DLC) |
| 2. |
Ignition "ON" & Engine
"OFF". |
| 3. |
Monitor the "A/T CON. RELAY VOLT" parameter
on the scantool
Specification:
Approx. B+
|

|
| 4. |
Is A/T RELAY VOLT within
specifications?
|

|
▶ Fault is
intermittent caused by poor contact in the sensor's and/or
TCM(PCM)'s connector or was repaired and TCM(PCM) memory was
not cleared. Throughly check connectors for looseness, poor
connection, bending, corrosion, contamination, deterioration
or damage.Repair or replace as necessary and go to
"Verification Of Vehicle Repair" procedure.
|
|

|
▶ Go to "W/Harness
Inspection"
procedure.
|
|
| Terminal and Connector
Inspection |
| 1. |
Many malfunctions in the electrical system
are caused by poor harness and terminals. Faults can also be caused
by interference from other electrical systems, and mechanical or
chemical damage. |
| 2. |
Thoroughly check connectors for looseness,
poor connection, bending, corrosion, contamination, deterioration,
or damage. |
| 3. |
Has a problem been found?
|

|
▶ Repair as
necessary and go to "Verification vehicle Repair"
procedure
|
|

|
▶ Go to "Power
Circuit Inspection" procedure
|
|
| 1. |
Ignition "ON" & Engine
"OFF". |
| 2. |
Disconnect the "A/T CONTROL RELAY"
connector |
| 3. |
Measure the voltage between terminal "1" of
the "A/T CONTROL RELAY" harness connector and chassis
ground.
Specification:
Approx. B+
|

|
| 4. |
Is voltage within
specifications?
|

|
▶ Go to "Signal
Circuit Inspection" procedure
|
|

|
▶ Check that
A/T-20A Fuse in engine room junction is installed or not
blown. ▶ Check for open in
harness. Repair as necessary and Go to "Verification Of
Vehicle Repair"
procedure
|
|
| Signal Circuit
Inspection |
| Check A/T
Control Relay Harness |
| 2. |
Disconnect the "A/T CONTROL RELAY"
connector |
| 3. |
Measure the voltage between terminal "4" of
the "A/T CONTROL RELAY" harness connector and chassis
ground. |
| 4. |
Turn ignition switch OFF → ON
Specification:
12V is measured only for approx. 0.5sec
|

|
| 5. |
Is resistance within
specifications?
|

|
▶ Go to "Check
Supplying Power to solenoid valve" proceduree
|
|

|
▶ Check for open in
harness. Repair as necessary and Go to "Verification Of
Vehicle Repair" procedure ▶ If
signal circuit is OK,Substitute with a known-good PCM/TCM and
check for proper operation. If the problem is corrected,
replace PCM/TCM and then go to "Verification of Vehicle
Repair"
procedure.
|
|
| Check Supplying
Power to Solenoid Valve Harness |
| 2. |
Disonnect the "A/T CONTROL RELAY" and
PCM/TCM connector |
| 3. |
Measure the resistance between terminal "3"
of the "A/T CONTROL RELAY" harness connector and terminal "49, 50"
of the PCM/TCM harness connector
Specification:
Approx. 0 Ω
|

|
| 4. |
Is resistance within
specifications?
|

|
▶ Go to "Ground
Circuit Inspection" procedure
|
|

|
▶ Check that
A/T-20A Fuse in engine room junction is installed or not
blown. ▶ Check for open in
harness. Repair as necessary and Go to "Verification Of
Vehicle Repair"
procedure
|
|
| Ground Circuit
Inspection |
| 2. |
Connect the "A/T CONTROL RELAY"
connector |
| 3. |
Measure the resistance between terminal "2"
of the "A/T CONTROL RELAY" harness connector and chassis
ground
Specification :
Approx. 0 Ω
|

|
| 4. |
Is resistance within
specifications?
|

|
▶ Go to "Component
Inspection" procedure
|
|

|
▶ Check for open in
harness. Repair as necessary and Go to "Verification Of
Vehicle Repair"
procedure
|
|
| 2. |
Remove "A/T CONTROL RELAY"
|
| 3. |
Measure the resistance between each teminal
of the sensor
Item
|
Termianl
No
|
Resistance
|
1(red) -
3(black)
|
INFINITE
|
2(black) - 4(red)
|
|
Supply(B+) to
number 4 and supply (B-) to number 2.
|
1(red) -
3(black)
|
0
Ω
|

|
| 4. |
Is resistance within
specifications?
|

|
▶ Thoroughly check
connectors for looseness, poor connection, bending, corrosion,
contamination, deterioration, or damage. Repair or replace as
necessary and then go to "Verification of Vehicle Repair"
procedure.
|
|

|
▶ Replace ATM
CONTROL RELAY and then go to "Verification of Vehicle Repair"
procedure.
|
|
| Verification Of Vehicle
Repair |
After a repair, it is
essential to verify that the fault has been corrected.
| 1. |
Connect scan tool and select "Diagnostic
Trouble Codes(DTCs)" mode. |
| 2. |
Using a scantool, Clear
DTC. |
| 3. |
Operate the vehicle within DTC Enable
conditions in General information. |
| 4. |
Are any DTCs present ?
|

|
▶ Go to the
applicable troubleshooting procedure.
|
|

|
▶ System performing
to specification at this
time.
|
|