Home › Fuel System › Engine Control System

P0646 A/C Clutch Relay Control Circuit Low

General Description
The A/C clutch relay is activated if the A/C switch is operated while the blower is running and system operation is enabled by the PCM. When A/C is requested, the Engine Control Module(PCM) provides a ground path to the A/C clutch relay control circuit. When the relay circuit is grounded, the A/C clutch relay is energized. The PCM delays grounding the relay circuit for a short time, so the PCM can adjust the engine idle speed for the additional load. The PCM will temporarily de-energized the A/C clutch relay for one or more of the following conditions:
-Full acceleration when the throttle is at WOT.(Wide Open Throttle)
-Risk of overheating: Engine coolant temp. exceeds threshold value
-A/C system pressure exceeds threshold value
-Engine starting
DTC Description
PCM sets DTC P0646 if the PCM detects signal lower than the possible range of a properly operating sensor.
DTC Detecting Condition
Item
Detecting Condition
Possible cause
DTC Strategy
•
Electrical Check
•
Open or short to ground in power circuit
•
Open or short to ground in Control circuit
•
Poor connection or damaged harness
•
Faulty A/C Compressor Relay
Enable Conditions
•
10V < Battery voltage < 16V
Threshold value
•
Short to Ground or Line Break
Diagnosis Time
•
50 sec.
MIL On Condition

•
-


Diagnostic Circuit Diagram

Monitor DTC Status
1.
Connect GDS and select "DTC Analysis" mode
2.
Click "DTC Status" on the menu bar to see DTC's information.
3.
Confirm that "DTC Readiness Flag" indicates "COMPLETED". If not, drive the vehicle within conditions noted in the freeze frame data or enable conditions.
4.
Read "DTC Status" parameter.

5.
Is parameter displayed "History(Not Present) fault"?
- History (Not Present) fault : DTC occurred but has been cleared.
- Present fault : DTC is occurring at present time.

▶ Fault is intermittent caused by poor contact in the sensor's and/or PCM's connector or was repaired and PCM memory was not cleared. Thoroughly check connectors for looseness, poor connection, bending, corrosion, contamination, deterioration, or damage. Repair or replace as necessary and then go to "Verification of Vehicle Repair" procedure.

▶ Go to next step as below

Terminal and Connector inspection
1.
Many malfunctions in the electrical system are caused by poor harness(es) and terminals. Faults can also be caused by interference from other electrical systems, and mechanical or chemical damage.
2.
Thoroughly check connectors for looseness, poor connection, bending, corrosion, contamination, deterioration, or damage.
3.
Has a problem been found?

▶ Repair as necessary and go to "Verification of Vehicle Repair" procedure

▶ Go to next procedure.

Power Circuit Inspection
■ Check for Short to Ground in Power Circuit
1.
IG KEY 'OFF'.
2.
Disassemble A/C Relay.
3.
Measure resistance between power terminal of A/C Relay harness side and chassis ground.

Specification : Infinite

4.
Is resistance within specification?

▶ Go to next procedure.

▶ Repair as necessary and go to "Verification of Vehicle Repair" procedure.

■ Check for Open in Power Circuit
1.
IG KEY 'OFF'.
2.
Disassemble A/C Relay.
3.
IG KEY 'ON'.
4.
Measure voltage between power terminal of A/C Relay harness side and chassis ground.

Specification : Approx. 12V

5.
Is voltage within specification?

▶ Go to next procedure.

▶ Repair as necessary and go to "Verification of Vehicle Repair" procedure.

Control Circuit Inspection
■ Check for Short to Ground in Control Circuit
1.
IG KEY 'OFF'.
2.
Disassemble A/C Relay.
3.
Measure resistance between control terminal of A/C Relay harness side and chassis ground.

Specification : Infinite

4.
Is resistance within specification?

▶ Go to next procedure.

▶ Repair as necessary and go to "Verification of Vehicle Repair" procedure.

■ Check for Open in Control Circuit
1.
IG KEY 'OFF'.
2.
Disassemble A/C Relay.
3.
IG KEY 'ON'.
4.
Measure voltage between control terminal of A/C Relay harness side and chassis ground.

Specification : Approx. 4.5 V

5.
Is voltage within specification?

▶ Check for poor connection between PCM and component: backed out terminal, improper mating, broken locks or poor terminal to wire connection. Repair as necessary and go to "Verification of Vehicle Repair" procedure.

▶ Repair as necessary and go to "Verification of Vehicle Repair" procedure.

Component Inspection
1.
Execute Actuation test of A/C Relay.
2.
Check the sound of A/C Relay operation. (Clicking repeatedly)
3.
Does A/C Relay operate normally?

▶ Go to next procedure.

▶ Substitute with a known-good A/C Relay and check for proper operation. If the problem is corrected, replace A/C Relay and then go to "Verification of Vehicle Repair" procedure.

Verification of Vehicle Repair
After a repair, it is essential to verify that the fault has been corrected.
1.
Connect GDS and select "DTC Analysis" mode.
2.
Click "DTC Status" and confirm that "DTC Readiness Flag" indicates "Complete". If not, drive the vehicle within conditions noted in the freeze frame data or enable conditions.
3.
Read "DTC Status" parameter.
4.
Is parameter displayed "History(Not Present) fault"?

▶ System performing to specification at this time. Clear the DTC.

▶ Go to the applicable troubleshooting procedure.