2007 Compass Patriot MK Factory Service Manual 7 - COOLING

INSTALLATION

GAS ENGINE




1. Install the lower air seal to radiator.
2. Position radiator into mounting position.
3. Position A/C condenser against radiator. Hand start fasteners.
4. Install radiator fan/shroud assembly. Hand start fasteners.
5. Tighten all condenser fasteners to 8 N·m (70 in. lbs.).
6. Tighten all radiator fan fasteners to 6 N·m (55 in. lbs.).
7. Install fasteners attaching transmission oil cooler to radiator. Tighten fasteners to 8 N·m (70 in. lbs.).
8. Raise vehicle on hoist.
9. Connect the lower air seal to the side air seals.
10. Connect lower radiator hose . Align the hose and position the clamp so it will not interfere with engine components.
11. Connect the radiator fan electrical connector.
12. Connect the power steering hoses.
13. Close radiator draincock.
14. Lower vehicle.
15. Connect upper radiator hose. Align the hose and position the clamp to prevent interference with the engine or hood.
16. Install upper radiator closure panel and center brace
(Refer to 23 - BODY/EXTERIOR/RADIATOR CLOSURE PANEL - INSTALLATION).
17. Install grille.
18. Install battery tray and battery.
19. Connect positive battery cable. Connect negative battery cable.
20. Install air cleaner housing assembly.
21. Fill cooling system with coolant (Refer to 7 - COOLING/ENGINE - STANDARD PROCEDURE).
22. Operate engine until it reaches normal operating temperature. Check cooling system for correct fluid level.

DIESEL



NOTE: Care must be taken not to damage the radiator cooling fins and tubes during installation.


1. Lower radiator into mounting position and reconnect Charge Air Cooler to radiator. Tighten bolts to 8 N·m (70 lbs. in.).
2. Position A/C condenser against radiator. Hand start lower fasteners.
3. Install radiator fan/shroud assembly. Hand start upper fasteners and remaining side fasteners that hold AC condenser .
4. Raise vehicle on hoist.
5. Connect charge air cooler hoses.
6. Install two remaining lower radiator fan shroud fasteners to radiator. Tighten fasteners to 6 N·m (55 in. lbs.).
7. If equipped, install fasteners attaching transmission oil cooler to radiator. Tighten fasteners to 8 N·m (70 in. lbs.).
8. Connect lower radiator hose. Align the hose and position the clamp so it will not interfere with engine components.
9. Connect the radiator fan motor electrical connector.
10. Close radiator draincock.
11. Lower vehicle.
12. Tighten radiator fan shroud fasteners to 6 N·m (55 in. lbs.).
13. Tighten AC condenser fasteners to 8 N·m (70 in. lbs.).
14. Install upper radiator hose. Align the hose and position the clamp to prevent interference with the engine or hood.
15. Install grille.
16. Install air cleaner housing assembly
(Refer to 9 - ENGINE/AIR INTAKE SYSTEM/AIR CLEANER HOUSING - INSTALLATION) .
17. Fill cooling system with appropriate coolant (Refer to 7 - COOLING/ENGINE - STANDARD PROCEDURE).
18. Connect negative battery cable.
19. Operate engine until it reaches normal operating temperature. Check cooling system for correct fluid level.