P0193-FUEL RAIL PRESSURE SENSOR HIGH
P0193-FUEL RAIL PRESSURE SENSOR HIGH
For a complete wiring diagram, refer to the Wiring Information.
-
When Monitored:
With the ignition on.
-
Set Condition:
The (K181) Fuel Rail Pressure Sensor Signal circuit voltage is above 4.75 Volts for 0.14 second.
Possible Causes |
|---|
| (K844) 5-VOLT SUPPLY CIRCUIT SHORTED TO VOLTAGE |
| (K181) FUEL RAIL PRESSURE SENSOR SIGNAL CIRCUIT SHORTED TO VOLTAGE |
| (K181) FUEL RAIL PRESSURE SENSOR SIGNAL CIRCUIT OPEN/HIGH RESISTANCE |
| (K359) FUEL RAIL PRESSURE SENSOR GROUND CIRCUIT OPEN/HIGH RESISTANCE |
| FUEL RAIL PRESSURE SENSOR |
| POWERTRAIN CONTROL MODULE (PCM) |
Always perform the Pre-Diagnostic Troubleshooting procedure before proceeding. (Refer to 28 - DTC-Based Diagnostics/MODULE, Powertrain Control (PCM) - Standard Procedure).
| NOTE: | If any Sensor Reference DTCs are present, perform those diagnostic procedures before continuing with this test. |
| 1. | Ignition on, engine not running. |
| 2. | With the scan tool, select View DTCs. |
Is the status Active for this DTC?
Yes
- Go To 2
No
- Perform the INTERMITTENT DTC diagnostic procedure. (Refer to 28 - DTC-Based Diagnostics/MODULE, Powertrain Control (PCM) - Standard Procedure).
2. CHECK THE (K181) FUEL PRESSURE SENSOR SIGNAL CIRCUIT FOR A SHORT TO VOLTAGE
| 1. | Turn the ignition off. |
| 2. | Disconnect the Fuel Rail Pressure Sensor harness connector. |
| 3. | Turn the ignition on. |
| 4. | Measure the voltage of the (K181) Fuel Rail Pressure Sensor Signal circuit in the Fuel Rail Pressure Sensor harness connector. |
Does the voltage measure above 5.2 Volts?
Yes
- Repair the (K181) Fuel Rail Pressure Sensor Signal circuit for a short to voltage.
- Perform the PCM VERIFICATION TEST. (Refer to 28 - DTC-Based Diagnostics/MODULE, Powertrain Control (PCM) - Standard Procedure).
No
- Go To 3
3. CHECK THE (K181) FUEL PRESSURE SENSOR SIGNAL CIRCUIT FOR AN OPEN/HIGH RESISTANCE
| 1. | Turn the ignition off. |
| 2. | Disconnect the PCM C1 harness connector. |
| 3. | Measure the resistance of the (K181) Fuel Rail Pressure Sensor Signal circuit between the Fuel Rail Pressure Sensor harness connector and the PCM C1 harness connector. |
Is the resistance below 5.0 Ohms?
Yes
- Go To 4
No
- Repair the (K181) Fuel Rail Pressure Sensor Signal circuit for an open or high resistance.
-
Perform the PCM VERIFICATION TEST. (Refer to 28 - DTC-Based Diagnostics/MODULE, Powertrain Control (PCM)
- Standard Procedure).
4. CHECK THE (K359) FUEL PRESSURE SENSOR GROUND CIRCUIT FOR AN OPEN/HIGH RESISTANCE
| 1. | Measure the resistance of the (K359) Fuel Rail Pressure Sensor Ground circuit between the Fuel Rail Pressure Sensor harness connector and the PCM C1 harness connector. |
Is the resistance below 5.0 Ohms?
Yes
- Go To 5
No
- Repair the (K359) Fuel Rail Pressure Sensor Ground circuit for an open or high resistance.
-
Perform the PCM VERIFICATION TEST. (Refer to 28 - DTC-Based Diagnostics/MODULE, Powertrain Control (PCM)
- Standard Procedure).
5. CHECK THE FUEL PRESSURE SENSOR
| 1. | Reconnect the Fuel Rail Pressure Sensor harness connector. |
| 2. | Reconnect the PCM C1 harness connector. |
| 3. | Turn the ignition on. |
| 4. | With the scan tool, clear DTCs. |
| 5. | Turn the ignition off. |
| 6. | Disconnect the Fuel Rail Pressure Sensor harness connector. |
| 7. | Connect a jumper wire between the (K359) Fuel Rail Pressure Sensor Ground circuit and the (K181) Fuel Rail Pressure Sensor Signal circuit at the Fuel Rail Pressure Sensor harness connector. |
| 8. | Turn the ignition on. |
| 9. | With the scan tool, select View DTCs. |
| NOTE: | The scan tool should display a Fuel Rail Pressure Sensor Low DTC as active with the jumper wire in place. |
Does the scan tool display the DTC as described above?
Yes
-
Replace the Fuel Rail Pressure Sensor in accordance with the service information.
NOTE: The Fuel Rail Pressure Sensor is not serviceable separate from the Fuel Rail Assembly. - Perform the PCM VERIFICATION TEST. (Refer to 28 - DTC-Based Diagnostics/MODULE, Powertrain Control (PCM) - Standard Procedure).
No
-
Go To 6
| 1. | Using the wiring diagram/schematic as a guide, inspect the wiring and connectors between the Fuel Rail Pressure Sensor and the Powertrain Control Module (PCM). |
| 2. | Look for any chafed, pierced, pinched, or partially broken wires. |
| 3. | Look for broken, bent, pushed out or corroded terminals. |
| 4. | Perform any Technical Service Bulletins that may apply. |
Were any problems found?
Yes
- Repair as necessary.
- Perform the PCM VERIFICATION TEST. (Refer to 28 - DTC-Based Diagnostics/MODULE, Powertrain Control (PCM) - Standard Procedure).
No
- Replace the Powertrain Control Module in accordance with the service information.
- Perform the PCM VERIFICATION TEST. (Refer to 28 - DTC-Based Diagnostics/MODULE, Powertrain Control (PCM) - Standard Procedure).