For a complete wiring diagram, refer to the Wiring Information.
Theory of Operation
The Powertrain Control Module (PCM) contains three internal 5-Volt Sensor Supply sources. Each 5-Volt Supply source is split into parallel circuits to provide 5 Volts to multiple sensors. Sensor Supply 2 provides 5 Volts to the Boost Pressure/Intake Air Temperature Sensor, Fuel Rail Pressure Sensor, Camshaft Position Sensor, and the Accelerator Pedal Position Sensor No.2.
When Monitored:
With the ignition on.
Set Condition:
The Powertrain Control Module (PCM) detects low voltage on the Sensor Supply 2 circuit for 0.10 second.
6.
CHECK THE 5-VOLT SUPPLY CIRCUIT FOR A SHORT TO GROUND
1.
Turn the ignition off.
2.
Disconnect the PCM harness connectors.
3.
Measure the resistance between ground and the (K857) Accelerator Pedal Position Sensor No. 2 5-Volt Supply circuit at the APP Sensor harness connector..
4.
Measure the resistance between ground and the (K844) 5-Volt Supply circuit at the CMP Sensor harness connector.
5.
Measure the resistance between ground and the (K356) Boost Pressure Sensor 5-Volt Supply circuit at the Boost Pressure/Intake Air Temperature Sensor 2 harness connector.
Is the resistance above 10k Ohms for each circuit?