2014 Jeep Wrangler JK Factory Service Manual 28 - DTC-Based Diagnostics

P0117-ENGINE COOLANT TEMPERATURE SENSOR CIRCUIT LOW

For a complete wiring diagram, refer to the Wiring Information.





Thoery of operation

The Engine Coolant Temperature (ECT) Sensor is a variable resistor that measures the temperature of the engine coolant. The Powertrain Control Module (PCM) supplies 5 Volts to the ECT Signal circuit and supplies a ground to the low reference circuit.


Possible Causes

(K2) ECT SIGNAL CIRCUIT SHORTED TO GROUND
(K2) ECT SIGNAL CIRCUIT SHORTED TO THE (K915) SENSOR GROUND CIRCUIT
ENGINE COOLANT TEMPERATURE (ECT) SENSOR
POWERTRAIN CONTROL MODULE (PCM)

Always perform the Pre-Diagnostic Troubleshooting procedure before proceeding. (Refer to 28 - DTC-Based Diagnostics/MODULE, Powertrain Control (PCM) - Standard Procedure).


1. ACTIVE DTC


1. Start the engine and allow it to reach normal operating temperature.

WARNING:

When the engine is operating, do not stand in direct line with the fan. Do not put your hands near the pulleys, belts or fan. Do not wear loose clothing. Failure to follow these instructions may result in possible serious or fatal injury.



NOTE: Diagnose and repair any system voltage DTCs before continuing with this test.
2. With the scan tool, select View DTCs.


Is the DTC Active at this time?

Yes


No


2. ECT SENSOR


1. Turn the ignition off.
2. Disconnect the ECT harness connector.
3. Ignition on, engine not running.
4. With the scan tool, read ECT voltage.


NOTE: The sensor voltage should be approximately 5.0 Volts (plus or minus .1 Volt) with the connector disconnected.


Does the scan tool display the voltage as described above?

Yes


No


3. (K2) ECT SIGNAL CIRCUIT SHORTED TO THE (K900) SENSOR GROUND CIRCUIT



1. Turn the ignition off.
2. Disconnect the PCM C2 harness connector.
3. Measure the resistance between the (K900) Sensor ground circuit and the (K2) ECT Signal circuit in the ECT Sensor harness connector.


Is the resistance below 5.0 Ohms?

Yes


No


4. (K2) ECT SIGNAL CIRCUIT SHORTED GROUND



1. Measure the resistance between ground and the (K2) ECT Signal circuit in the ECT Sensor harness connector.


Is the resistance below 100 Ohms?

Yes


No


5. POWERTRAIN CONTROL MODULE (PCM)


1. Using the wiring diagram/schematic as a guide, inspect the wiring and connectors between the ECT Sensor and the Powertrain Control Module (PCM).
2. Look for any chafed, pierced, pinched or partially broken wires.
3. Look for broken, bent, pushed out or corroded terminals. Verify that there is good pin to terminal contact in the ECT Sensor and Powertrain Control Module connectors.
4. Perform any Technical Service Bulletins that may apply.


Were there any problems found?

Yes


No