SHIFT LEVER > INSTALLATION


  1. INSTALL TRANSMISSION INSTRUMENT PANEL SHIFT ASSEMBLY

  2. INSTALL CONSOLE BOX LH (for LHD)

  3. INSTALL CONSOLE BOX RH (for RHD)

  4. INSTALL CONSOLE BOX INSERT

  5. INSTALL REAR CONSOLE BOX ASSEMBLY

  6. INSTALL CONSOLE BOX CARPET

  7. INSTALL REAR CONSOLE BOX POCKET

  8. INSTALL INTEGRATION CONTROL AND PANEL ASSEMBLY

  9. INSTALL UPPER CONSOLE PANEL SUB-ASSEMBLY

  10. INSTALL UPPER NO. 1 CONSOLE PANEL GARNISH

  11. INSTALL UPPER NO. 2 CONSOLE PANEL GARNISH

  12. INSTALL LOWER CENTER INSTRUMENT PANEL FINISH PANEL

  13. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY

  14. CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL

  15. INSTALL REAR FLOOR BOARD UPPER NO. 3 PLATE

  16. INSTALL DECK FLOOR BOX RH

  17. INSTALL REAR NO. 3 FLOOR BOARD

  18. INSTALL REAR DECK FLOOR BOX

  19. INSTALL REAR NO. 2 FLOOR BOARD

  20. INSPECT SHIFT LEVER