FLOOR SHIFT ASSEMBLY > INSTALLATION


  1. INSTALL FLOOR SHIFT ASSEMBLY

  2. INSTALL FLOOR SHIFT GEAR SHIFTING ROD SUB-ASSEMBLY

  3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

  4. ADJUST SHIFT LEVER POSITION

  5. INSPECT SHIFT LEVER POSITION

  6. INSTALL FRONT FLOOR HEAT INSULATOR NO.1

  7. INSTALL FRONT EXHAUST PIPE ASSEMBLY

  8. INSTALL NO.2 CONSOLE BOX DUCT

  9. INSTALL CONSOLE BOX

  10. INSTALL CONSOLE BOX REGISTER ASSEMBLY

  11. REMOVE CONSOLE BOX PLATE

  12. INSTALL INSTRUMENT PANEL FINISH PANEL END LH

  13. INSTALL INSTRUMENT PANEL FINISH PANEL END RH

  14. INSTALL CONSOLE UPPER PANEL ASSEMBLY

  15. INSTALL FRONT CONSOLE UPPER PANEL GARNISH

  16. PERFORM INITIALIZATION