Lexus IS250 · Service Manual TRANSMISSION

INSTALLATION

Removal / installation


1. TEMPORARILY TIGHTEN CLUTCH ACCUMULATOR ASSEMBLY

  1. C125926
    Temporarily tighten the clutch accumulator with the 2 bolts.


2. CONNECT CLUTCH TUBE

  1. C116472E01
    Using SST, connect the clutch tube.
    SST
    09023-12701  

    Torque:
    When using SST:
    21 N*m{ 216 kgf*cm , 16 ft.*lbf }
    When not using SST:
    23 N*m{ 235 kgf*cm , 17 ft.*lbf }

    HINT:
    Use a torque wrench with a fulcrum length of 345 mm (13.58 in.).

  1. C116470E01
    Connect the clutch tube to the bracket with a new clip.

  1. Using SST, connect the clutch tube.

    SST
    09023-00101  

    Torque:
    15 N*m{ 153 kgf*cm , 11 ft.*lbf }

    HINT:
    Use a torque wrench with a fulcrum length of 300 mm (11.81 in.).


3. CONNECT CLUTCH LINE

  1. C125932E01
    Using SST, connect the clutch line.

    Torque:
    15 N*m{ 153 kgf*cm , 11 ft.*lbf }

    HINT:
    Use a torque wrench with a fulcrum length of 300 mm (11.81 in.).

  1. Temporarily tighten the clutch line with the bolt.


4. FULLY TIGHTEN CLUTCH ACCUMULATOR ASSEMBLY

C125930
  1. Fully tighten the clutch accumulator with the 3 bolts.

    Torque:
    12 N*m{ 120 kgf*cm , 9 ft.*lbf }


5. BLEED CLUTCH LINE
  1. Fill the brake reservoir with the brake fluid and bleed the clutch system (Click here).

    Torque:
    11 N*m{ 112 kgf*cm , 8 ft.*lbf }


6. CHECK FOR BRAKE FLUID LEAKAGE
  1. Check for leakage in the clutch system.


7. CHECK FOR BRAKE FLUID LEVEL IN RESERVOIR
← REMOVALCOMPONENTS →