Home Engine/Hybrid System Emission Control 3UR-FE EMISSION CONTROL: PURGE VALVE
Last Modified: 11-27-2007 1.6 A
Service Category: Engine/Hybrid System Section: Emission Control
Model Year: 2008 Model: LX570 Doc ID: RM0000030WI006X
Title: 3UR-FE EMISSION CONTROL: PURGE VALVE: INSTALLATION (2008 LX570)

INSTALLATION

1. INSTALL PURGE VSV


(a) Install the purge VSV with the bolt.

Torque: 21 N·m (214 kgf·cm, 15 ft·lbf)

(b) Connect the purge VSV connector.

2. CONNECT PURGE LINE HOSE

(a) Connect the 2 hoses.

HINT:

Turn the claw of the clip to the upper side.

3. INSTALL V-BANK COVER SUB-ASSEMBLY 3UR-FE ENGINE MECHANICAL: ENGINE ASSEMBLY: INSTALLATION (2008 LX570)+