INSPECTION
Inspection
| INSPECT TIE ROD ASSEMBLY LH |
Secure the tie rod assembly LH in a vise.
Install the nut to the stud bolt.
Flip the ball joint back and forth 5 times or more.
Using a torque wrench, turn the nut continuously at a rate of 3 to 5 seconds per turn and take the torque reading on the 5th turn.

- Turning torque:
- 0.49 to 3.43 N*m (5.0 to 35 kgf*cm, 4.3 to 30.4 in.*lbf)
| INSPECT TIE ROD ASSEMBLY RH |
- HINT:
- Perform the same procedure as for the LH side.
| INSPECT TOTAL PRELOAD |
Temporarily install the left and right steering rack ends to prevent steering rack over stroke.
Using SST and a torque wrench, inspect total preload.

- SST
- 09616-00011
- Preload (turning):
- 1.0 to 2.0 N*m (10.2 to 20.4 kgf*cm, 8.9 to 17.7 in.*lbf)
| INSPECT POWER STEERING LINK ASSEMBLY (TORQUE SENSOR) |
Measure the resistance according to the value(s) in the table below.

- Resistance:
Tester connection
(Symbols)
Condition
Specified condition
P44-1 (INCS) - P44-7 (TQG2)
Always
90 to 170 Ω P44-
P44-2 (INSN) - P44-7 (TQG2)
Always
300 to 430 Ω
P44-4 (TRQV) - P44-8 (TQG1)
Always
4 to 14 Ω
P44-5 (OUCS) - P44-7 (TQG2)
Always
90 to 170 Ω
P44-6 (OUSN) - P44-7 (TQG2)
Always
300 to 430 Ω
| INSPECT POWER STEERING LINK ASSEMBLY (POWER STEERING MOTOR) |
Measure the resistance according to the value(s) in the table below.

- Resistance:
Tester connection
(Symbols)
Condition
Specified condition
P43-3 (U) - P43-2 (V)
Always
Below 1 Ω
P43-2 (V) - P43-1 (W)
Always
Below 1 Ω
P43-1 (W) - P43-3 (U)
Always
Below 1 Ω
