IGNITION TIMING CHECK
2018 / ECLIPSE CROSS / EC - Workshop Manual
11 -ENGINE > 11A-ENGINE MECHANICAL > ON-VEHICLE SERVICE > IGNITION TIMING CHECK
1. Before inspection, set the vehicle to the pre-inspection condition.
2. Turn the ignition switch to the "LOCK" (OFF) position and then connect the M.U.T.-IIISE to the diagnosis connector (Refer to GROUP 00 - Precautions Before Service - M.U.T.-IIISE ).
 
3. Set the timing light to the power supply line (terminal No. 3) of the ignition coil No. 1.
noteThe power supply line is looped and also longer than the other ones.
4. Start the engine and let it run at idle.
5. Select the item No. 2 on M.U.T.-IIISE and measure engine idle speed and check that it is approximately 750 r/min.
6. Select No. 11 (actuator test function) of the M.U.T.-IIISE, and set the ignition timing to the basic ignition timing.
7. Check that basic ignition timing is within the standard value.
Standard value: 5° BTDC ± 3°
8. If the basic ignition timing is outside the standard value, inspect the MPI system (Refer to GROUP 13A - Troubleshooting - Inspection Chart for Trouble symptoms ).
cautionIf the test is not cancelled, a forced driving will continue for 27 minutes. Driving under this condition may damage the engine.
9. Cancel the actuator test function item No. 11, Basic ignition timing set mode, on M.U.T.-IIISE
10. Check that ignition timing is at the standard value.
Standard value: approximately 10° BTDC
note
  • The ignition timing may fluctuate within ± 7°. This is normal.
  • In higher altitude, the ignition timing is more advanced than the standard value by approximately 5°.
  • Wait till approximately 1 minute passes after the engine started, and check the ignition timing when the engine stabilized.
11. Remove the timing light.
12. Turn the ignition switch to the "LOCK" (OFF) position and then disconnect the M.U.T.-IIISE.