STEP 1. M.U.T.-IIISE data list
STEP 2. Perform voltage measurement at boost pressure sensor connector.
- Disconnect connector, and measure at harness side.
- Ignition switch: ON
- Voltage between terminal engine-ECU UPS5 line and body earth.
OK: 4.9 - 5.1 V
Is the check result normal?
Go to Step 5.
Go to Step 3.
STEP 3. Check of open circuit, and short circuit in UPS5 line between boost pressure sensor connector and engine-ECU connector.
Is the check result normal?
Go to Step 4.
Repair the connector(s) or wiring harness.
STEP 4. M.U.T.-IIISE data list
STEP 5. Check of damage in UPS5 line between boost pressure sensor connector and engine-ECU connector.
Is the check result normal?
Go to Step 6.
Repair the connector(s) or wiring harness.
STEP 6. Perform voltage measurement at boost pressure sensor connector.
- Use special tool test harness (MB991709) to connect connector, and measure at pick-up harness.
- Ignition switch: ON
- Voltage between terminal engine-ECU UPS line and body earth.
- Altitude 0 m: 3.8 - 4.2 V
- Altitude 600 m: 3.5 - 3.9 V
- Altitude 1,200 m: 3.3 - 3.7 V
- Altitude 1,800 m: 3.0 - 3.4 V
Is the check result normal?
Go to Step 8.
Go to Step 7.
STEP 7. Check of short to earth in UPS line between boost pressure sensor connector and engine-ECU connector.
Is the check result normal?
Replace the boost pressure sensor.
Repair the connector(s) or wiring harness.
STEP 8. Check of open circuit, and damage in UPS line between boost pressure sensor connector and engine-ECU connector.
Is the check result normal?
Go to Step 4.
Repair the connector(s) or wiring harness.