[ Model - ECLIPSE CROSS / Year - 2018 ]
Workshop Manual
Technical Information Manual
Body Repair Manual
Pre-delivery Inspection and Periodic Maintenance
PRINT
PRINT (GROUP)
2018 / ECLIPSE CROSS / EC - Workshop Manual
14 -ENGINE COOLING > WATER PUMP > WATER PUMP REMOVAL AND INSTALLATION
REMOVAL AND INSTALLATION
Pre-removal Operation
Engine Coolant Draining (Refer to
).
Drive Belt Removal (Refer to GROUP 11A - Crankshaft Pulley
).
Post-installation Operation
Drive Belt Installation (Refer to GROUP 11A - Crankshaft Pulley
).
Drive Belt Tension Check (Refer to GROUP 11A - On-vehicle Service, Drive Belt Tension Check and Adjustment
).
Engine Coolant Refilling (Refer to
).
Removal steps
1.
Water pump pulley
2.
Water pump
3.
Water pump gasket