2018 / ECLIPSE CROSS / EC - Workshop Manual
16 -ENGINE ELECTRICAL > CHARGING SYSTEM > ALTERNATOR ASSEMBLY > ALTERNATOR ASSEMBLY REMOVAL AND INSTALLATION
REMOVAL AND INSTALLATION
 
 
Pre-removal Operation
  • Engine Room Under Cover Front A, B and Engine Room Side Cover (RH) Removal (Refer to GROUP 51- Under Cover ).
  • Alternator and Others Belt Removal (Refer to GROUP 11A - Crankshaft Pulley ).
Post-installation Operation
  • Alternator and Others Belt Installation (Refer to GROUP 11A - Crankshaft Pulley ).
  • Alternator and Others Belt Tension Check (Refer to GROUP 11A - On-vehicle Service, Alternator and Others Belt Tension Check ) .
  • Engine Room Under Cover Front A, B and Engine Room Side Cover (RH) Installation (Refer to GROUP 51 - Under Cover ).
 
Removal steps
1.Alternator connector
2.Alternator terminal
3.Alternator bracket
4.Alternator assembly