[ Model - ECLIPSE CROSS / Year - 2018 ]
Workshop Manual
Technical Information Manual
Body Repair Manual
Pre-delivery Inspection and Periodic Maintenance
PRINT
PRINT (GROUP)
2018 / ECLIPSE CROSS / EC - Workshop Manual
17 -ENGINE AND EMISSION CONTROL > EMISSION CONTROL > EVAPORATIVE EMISSION CONTROL SYSTEM > CANISTER REMOVAL AND INSTALLATION
REMOVAL AND INSTALLATION
Pre-removal and post-installation operation
Air Cleaner Body Removal and Installation (Refer to GROUP 15 - Air Cleaner
).
Removal steps
1.
Canister vacuum hose connection
2.
Fuel vapour control line hose
>>A<<
3.
Fuel vapour control line cap
4.
Fuel vapour canister cover A
5.
Fuel vapour canister cover B
6.
Fuel vapour canister
7.
Fuel vapour canister bracket
INSTALLATION SERVICE POINT
>>A<< FUEL VAPOUR CONTROL LINE CAP INSTALLATION
Install the fuel vapour control line cap is set as shown in the figure.