- Put an oil drain pan nearby. Remove the two bolts connecting the oil cooler
lines to the bottom of the attachment. Drain oil into the pan.
- Remove the bolt connecting the bracket for these two oil lines to the block.
Pull the oil lines away from the block and drain them into the pan.
- Remove the three oil cooler mounting bolts and remove it.
- To install, reverse the above procedure, using new sealing gaskets on the
cooler lines. Tighten the piping brace–to–block bolt to 20 ft.
lbs. (27 Nm), and the piping–to–attachment bolts to 25 ft. lbs.
(33 Nm).