Previous Next

REMOVAL & INSTALLATION

External Regulator
  1. Disconnect the negative battery cable.
  2. Disengage the multi-wire connector and automatic choke lead (1974 and later models) from the regulator.
  3. Remove the two regulator mounting screws and remove the regulator from the fender panel.

    To install:

  4. Install the new regulator and tighten the mounting screws.
  5. Engage the multi-wire connector and choke lead.
  6. Connect the negative battery cable.
Internal Regulator
  1. Remove the alternator as outlined in this section.
  2. Matchmark the alternator case and remove the case fasteners.
  3. Separate the two case halves.
  4. Loosen the voltage regulator retainers and remove the voltage regulator.

    To install:

  5. Install the voltage regulator and tighten the fasteners.
  6. Engage the two halves of the alternator case together making sure to line up the matchmarks. Tighten the case fasteners.
  7. Install the alternator in the vehicle.

Previous Next