Home › BRAKE › BRAKE CONTROL › VEHICLE STABILITY CONTROL SYSTEM

VEHICLE STABILITY CONTROL SYSTEM > TS and CG Terminal Circuit

for Preparation Click here


DESCRIPTION

The signal check circuit detects trouble in the sensor or switch signal which cannot be detected by the DTC check.
Connecting terminals TS and CG of the DLC3 starts the check.

WIRING DIAGRAM


C114571E04


INSPECTION PROCEDURE

NOTICE:
When replacing the master cylinder solenoid, perform zero point calibration (Click here).

1.CHECK HARNESS AND CONNECTOR (SKID CONTROL ECU - DLC3 (TS))


    C124792E05
  1. Turn the ignition switch off.

  1. Disconnect the skid control ECU connector.

  1. Measure the resistance according to the value(s) in the table below.

    Standard resistance:
    Tester Connection
    Specified condition
    S28-24 (TS) - D1-12 (TS)
    Below 1 Ω



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK


2.CHECK HARNESS AND CONNECTOR (BODY GROUND - DLC3 (CG))


    F100115E46
  1. Measure the resistance according to the value(s) in the table below.

    Standard resistance:
    Tester Connection
    Specified condition
    D1-4 (CG) - Body ground
    Below 1 Ω



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK


3.CHECK HARNESS AND CONNECTOR (BODY GROUND - DLC3 (TS))


    F100115E47
  1. Measure the resistance according to the value(s) in the table below.

    Standard resistance:
    Tester Connection
    Specified Condition
    D1-12 (TS) - Body ground
    10 kΩ or higher



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK

REPLACE MASTER CYLINDER SOLENOID