25701
1.INSPECT NO. 1 EMISSION CONTROL VALVE SET
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| 1 - 5 | 20°C (68°F) | 4.5 to 5.5 Ω |
| 1 - Body ground | Always | 1 MΩ or higher |
| 5 - Body ground |
| *a | Component without harness connected
(No. 1 Emission Control Valve Set) |
When measuring the resistance, do not touch terminals 2, 3 or 4.
When measuring the resistance, make sure that the surface temperature of the No. 1 emission control valve set is 20°C.
If the result is not as specified, replace the No. 1 emission control valve set.
Check the operation of the No. 1 emission control valve set.
Check that air does not flow from port A to port B.
| *1 | Air |
| *2 | Port A |
| *3 | Port B |
Make sure the applied pressure is 30 kPa (0.3 kgf/cm2, 4.4 psi) or less.
If the result is not as specified, replace the No. 1 emission control valve set.
Apply battery voltage across terminals 1 and 5.
When applying voltage, do not touch terminals 2, 3 or 4.
Check that air flows from port A to port B.
| *1 | Air |
| *2 | Port A |
| *3 | Port B |
If the result is not as specified, replace the No. 1 emission control valve set.