OIL COOLER > INSTALLATION |
| 1. INSTALL NO. 2 OIL COOLER TUBE SUB-ASSEMBLY |
![]() |
Temporarily install the oil cooler tube to the fan shroud with bolt A. Install bolt B and tighten it to the specified torque. Then tighten bolt A to the specified torque.
| 2. INSTALL NO. 2 OIL COOLER INLET HOSE AND NO. 2 OIL COOLER OUTLET HOSE |
![]() |
Connect the No. 2 oil cooler inlet hose and No. 2 oil cooler outlet hose to the No. 2 oil cooler tube.
| *1 | Yellow Point Mark |
Connect the 2 hoses to the radiator to install them.
| 3. INSTALL NO. 1 INLET OIL COOLER TUBE AND NO. 1 OUTLET OIL COOLER TUBE |
![]() |
Install the 2 No. 2 flexible hose clamps with the 2 bolts.
Temporarily install the ends of the 2 oil cooler tubes to each oil cooler tube union by hand.
Close the 2 No. 2 flexible hose clamps and install the 2 bolts.
Using a union nut wrench, tighten the inlet and outlet tubes.
| 4. INSTALL NO. 1 OIL COOLER INLET HOSE AND NO. 1 OIL COOLER OUTLET HOSE |
![]() |
Connect the No. 1 oil cooler inlet hose and No. 1 oil cooler outlet hose to the oil cooler inlet tube and No. 1 oil cooler outlet tube.
| *1 | Blue Paint Mark |
| *2 | Pink Paint Mark |
| *3 | White Paint Mark |
Connect the 2 hoses to the No. 2 oil cooler tube to install them, and then pass the 2 hoses through the No. 1 flexible hose clamp and close the clamp.
| 5. ADJUST AUTOMATIC TRANSMISSION FLUID LEVEL |
Adjust the automatic transmission fluid level (Click here).
| 6. INSTALL FRONT NO. 1 FENDER APRON TO FRAME SEAL RH |
Install the front No. 1 fender apron to frame seal RH with the 5 clips.
| 7. INSTALL FRONT FENDER APRON SEAL RH |
Install the front fender apron seal RH with the 4 clips.
| 8. INSTALL REAR ENGINE UNDER COVER ASSEMBLY |
Install the rear engine under cover assembly with the 4 bolts.
| 9. INSTALL NO. 1 ENGINE UNDER COVER SUB-ASSEMBLY |
![]() |
Hook the No. 1 engine under cover sub-assembly to the vehicle body as shown in the illustration.
Install the 4 bolts.