Home › Brake › BRAKE CONTROL / DYNAMIC CONTROL SYSTEMS › VEHICLE STABILITY CONTROL SYSTEM

VEHICLE STABILITY CONTROL SYSTEM > TS and CG Terminal Circuit

for Preparation Click here


DESCRIPTION

The signal check circuit detects trouble in the sensor or switch signal which cannot be detected by the DTC check.
Connecting terminals TS and CG of the DLC3 starts the check.

WIRING DIAGRAM


C200428E06


INSPECTION PROCEDURE

NOTICE:
When replacing the master cylinder solenoid, perform calibration (Click here).

1.CHECK HARNESS AND CONNECTOR (SKID CONTROL ECU - DLC3)
  1. Turn the ignition switch off.

  1. Disconnect the A6 skid control ECU connector.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    A6-24 (TS) - F13-12 (TS)
    Always
    Below 1 Ω



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK


2.CHECK HARNESS AND CONNECTOR (DLC3 - BODY GROUND)
  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    F13-4 (CG) - Body ground
    Always
    Below 1 Ω



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK


3.CHECK HARNESS AND CONNECTOR (DLC3 - BODY GROUND)
  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    F13-12 (TS) - Body ground
    Always
    10 kΩ or higher



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK

REPLACE MASTER CYLINDER SOLENOID (Click here)