GENERATOR > INSTALLATION |
| 1. INSTALL GENERATOR ASSEMBLY |
Install the generator bracket to the generator with the bolt.
Install the generator with the 2 bolts.
Install the generator bracket with the bolt.
Attach the wire harness clamp.
Install the wire harness with the 2 bolts.
Connect the generator connector to the generator.
Install the generator wire with the nut.
Close the terminal cap.
| 2. INSTALL NO. 2 EXHAUST MANIFOLD HEAT INSULATOR |
Install the No. 2 exhaust manifold heat insulator with the 3 bolts.
| 3. INSTALL WIRING HARNESS CLAMP BRACKET |
Install the wiring harness clamp bracket with the bolt.
Attach the clamp.
| 4. INSTALL NO. 2 IDLER PULLEY SUB-ASSEMBLY |
for Integrated Type:
Install the No. 2 idler pulley with the bolt.
for Separate Type:
Install the idler pulley cover plate, No. 2 idler pulley and No. 2 idler pulley cover plate with the bolt.
| 5. INSTALL FAN AND GENERATOR V BELT |
![]() |
Set the V belt onto every part.
| *1 | Vane Pump |
| *2 | Water Pump |
| *3 | No. 2 Idler |
| *4 | Generator |
| *5 | Cooler Compressor |
| *6 | No. 1 Idler |
| *7 | Crankshaft |
| *8 | V-ribbed Belt Tensioner |
While turning the belt tensioner counterclockwise, remove the pin.
Check that the belt fits properly in the ribbed grooves.
| 6. INSTALL V-BANK COVER |
![]() |
Attach the 2 V-bank cover hooks to the bracket. Then align the 2 V-bank cover grommets with the 2 pins and press down on the V-bank cover to attach the pins.
| *1 | Pin |
| *2 | V-bank Cover Hook |
| 7. INSTALL BATTERY TRAY |
| 8. INSTALL BATTERY |
| 9. INSTALL BATTERY CLAMP |
Install the battery clamp with the 2 nuts.
| 10. CONNECT CABLE TO POSITIVE BATTERY TERMINAL |
| 11. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |