Home › Power Source / Network › 1GR-FE BATTERY / CHARGING › GENERATOR

GENERATOR > INSTALLATION

for Preparation Click here



1. INSTALL GENERATOR ASSEMBLY
  1. Install the generator bracket to the generator with the bolt.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }

  1. Install the generator with the 2 bolts.

    Torque:
    43 N*m{ 438 kgf*cm , 32 ft.*lbf }

  1. Install the generator bracket with the bolt.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }

  1. Attach the wire harness clamp.

  1. Install the wire harness with the 2 bolts.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }

  1. Connect the generator connector to the generator.

  1. Install the generator wire with the nut.

    Torque:
    9.8 N*m{ 100 kgf*cm , 87 in.*lbf }

  1. Close the terminal cap.



2. INSTALL NO. 2 EXHAUST MANIFOLD HEAT INSULATOR
  1. Install the No. 2 exhaust manifold heat insulator with the 3 bolts.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }



3. INSTALL WIRING HARNESS CLAMP BRACKET
  1. Install the wiring harness clamp bracket with the bolt.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }

  1. Attach the clamp.



4. INSTALL NO. 2 IDLER PULLEY SUB-ASSEMBLY
  1. for Integrated Type:
    Install the No. 2 idler pulley with the bolt.

    Torque:
    54 N*m{ 551 kgf*cm , 40 ft.*lbf }

  1. for Separate Type:
    Install the idler pulley cover plate, No. 2 idler pulley and No. 2 idler pulley cover plate with the bolt.

    Torque:
    54 N*m{ 551 kgf*cm , 40 ft.*lbf }



5. INSTALL FAN AND GENERATOR V BELT


    A225650E01
  1. Set the V belt onto every part.
    Text in Illustration 
    *1
    Vane Pump
    *2
    Water Pump
    *3
    No. 2 Idler
    *4
    Generator
    *5
    Cooler Compressor
    *6
    No. 1 Idler
    *7
    Crankshaft
    *8
    V-ribbed Belt Tensioner

  1. While turning the belt tensioner counterclockwise, remove the pin.

    NOTICE:
    Make sure that the V belt is properly installed to each pulley.

  1. Check that the belt fits properly in the ribbed grooves.

    HINT:
    Make sure to check by hand that the belt has not slipped out of the grooves on the bottom of the pulley.



6. INSTALL V-BANK COVER


    A229926E01
  1. Attach the 2 V-bank cover hooks to the bracket. Then align the 2 V-bank cover grommets with the 2 pins and press down on the V-bank cover to attach the pins.
    Text in Illustration 
    *1
    Pin
    *2
    V-bank Cover Hook



7. INSTALL BATTERY TRAY


8. INSTALL BATTERY


9. INSTALL BATTERY CLAMP
  1. Install the battery clamp with the 2 nuts.

    Torque:
    6.0 N*m{ 61 kgf*cm , 53 in.*lbf }



10. CONNECT CABLE TO POSITIVE BATTERY TERMINAL


11. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).