INTAKE MANIFOLD > INSTALLATION |
| 1. INSTALL INTAKE MANIFOLD |
![]() |
Set a new gasket on each cylinder head.
Set the intake manifold on the cylinder heads.
![]() |
Install and uniformly tighten the 6 bolts and 4 nuts in several passes.
![]() | Bolt |
![]() | Nut |
| 2. INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY |
Place the fuel delivery pipe together with the 6 fuel injectors on the intake manifold.
Temporarily install the 4 bolts, which are used to hold the fuel delivery pipe in place, to the intake manifold.
![]() |
Check that the fuel injectors rotate smoothly.
| *1 | Turn |
Position the fuel injectors with the connectors facing outward.
Tighten the 6 bolts.
Connect the 6 fuel injector connectors.
| 3. CONNECT NO. 2 FUEL PIPE SUB-ASSEMBLY |
![]() |
Connect the No. 2 fuel pipe sub-assembly (Click here).
| 4. CONNECT NO. 1 FUEL PIPE SUB-ASSEMBLY |
![]() |
Connect the No. 1 fuel pipe sub-assembly (Click here).
| 5. INSTALL INTAKE AIR SURGE TANK |
Install a new gasket to the intake air surge tank.
![]() |
Install the intake air surge tank with the 4 bolts and 2 nuts in the order shown in the illustration.
![]() | Bolt |
![]() | Nut |
Install the No. 1 surge tank stay with the 2 bolts.
Attach the wire harness clamp.
Install the No. 2 surge tank stay with the 2 bolts.
Install the throttle body bracket with the 2 bolts.
![]() |
Connect the No. 1 ventilation hose.
| *a | Front |
| *b | Matchmark |
| *c | Top |
Connect the No. 1 vacuum switching valve connector.
Connect the No. 1 vapor fuel feed hose.
![]() |
Connect the throttle body connector.
| *a | Front |
| *b | Matchmark |
| *c | RH |
Connect the No. 4 water by-pass hose.
Connect the No. 5 water by-pass hose.
Attach the 2 heater hose clamps.
| 6. INSTALL AIR TUBE ASSEMBLY |
for Bank 1 Side:
![]() |
Align the paint mark with the projection and connect the air tube assembly to the No. 1 emission control valve set.
| *a | Projection |
| *b | Paint Mark |
| *c | Upper |
| *d | RH |
for Bank 2 Side:
![]() |
Align the paint mark with the projection and connect the air tube assembly to the No. 2 emission control valve set.
| *a | Paint Mark |
| *b | Projection |
| *c | Upper |
| *d | LH |
Install the 3 bolts.
| 7. INSTALL NO. 1 AIR CLEANER HOSE |
![]() |
Install the No. 1 air cleaner hose with the 2 hose clamps.
| *a | Paint Mark |
| *b | Protrusion |
| *c | Groove |
| *d | Top |
| *e | RH |
| *f | Front |
Install the bolt.
Connect the vacuum hose and ventilation hose.
Attach the wire harness clamp.
| 8. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
| 9. ADD ENGINE COOLANT |
Tighten the cylinder block drain cock plug.
Tighten the radiator drain cock plug by hand.
Add engine coolant.
Slowly pour coolant into the radiator reservoir until it reaches the F line.
Install the reservoir cap.
Install the radiator cap.*1
Start the engine and stop it immediately.*2
Allow approximately 10 seconds to pass. Then remove the radiator cap and check the coolant level. If the coolant level has decreased, add coolant.*3
Repeat steps *1, *2 and *3 until the coolant level does not decrease.
Install the radiator cap.*4
Set the air conditioning as follows.*5
| Item | Condition |
| Fan speed | Any setting except off |
| Temperature | Toward WARM |
| Air conditioning switch | Off |
Start the engine, warm it up until the thermostat opens, and then continue to run the engine for several minutes to circulate the coolant.*6
Stop the engine, wait until the engine coolant cools down to ambient temperature. Then remove the radiator cap and check the coolant level.*7
If the coolant level has decreased, add coolant and warm up the engine until the thermostat opens.*8
If the coolant level has not decreased, check that the coolant level in the radiator reservoir is at the F line.
If the coolant level is below the F line, repeat steps *4 through *8.
If the coolant level is above the F line, drain coolant until the coolant level reaches the F line.
| 10. INSPECT FOR COOLANT LEAK |
Fill the radiator with engine coolant, and then attach a radiator cap tester.
Warm up the engine.
Using the radiator cap tester, increase the pressure inside the radiator to 123 kPa (1.3 kgf/cm2, 18 psi), and then check that the pressure does not drop.
If the pressure drops, check the hoses, radiator and water pump for leakage. If there are no signs or traces of external engine coolant leakage, check the heater core, cylinder block and head.
| 11. INSPECT FOR FUEL LEAK |
Make sure that there are no fuel leaks after performing maintenance on the fuel system.
Connect the Techstream to the DLC3.
Turn the ignition switch to ON and turn the Techstream on.
Enter the following menus: Powertrain / Engine and ECT / Active Test / Control the Fuel Pump / Speed.
Check that there are no leaks from the fuel system.
If there are fuel leaks, repair or replace parts as necessary.
Turn the ignition switch off.
Disconnect the Techstream from the DLC3.
| 12. INSTALL V-BANK COVER |
![]() |
Attach the 2 V-bank cover hooks to the bracket. Then align the 2 V-bank cover grommets with the 2 pins and press down on the V-bank cover to attach the pins.
| *1 | Pin |
| *2 | V-bank Cover Hook |
| 13. INSTALL NO. 1 ENGINE UNDER COVER SUB-ASSEMBLY |
![]() |
Hook the No. 1 engine under cover sub-assembly to the vehicle body as shown in the illustration.
Install the 4 bolts.
| 14. INSTALL FRONT LOWER BUMPER COVER (w/o Intuitive Parking Assist System) |
Install the front lower bumper cover with the 5 bolts and clip.
| 15. INSTALL AIR INTAKE DUCT LH (w/ Intuitive Parking Assist System) |
Install the air intake duct LH with the 2 screws.
Install the clip and bolt.
| 16. INSTALL AIR INTAKE DUCT RH (w/ Intuitive Parking Assist System) |
| 17. INSTALL FRONT LOWER BUMPER COVER (w/ Intuitive Parking Assist System) |
Install the front lower bumper cover with the 4 bolts and clip.
| 18. INSTALL COOL AIR INTAKE DUCT (for 4WD with Intuitive Parking Assist System) |
Install the cool air intake duct with the 4 clips.