Home › Vehicle Exterior › LIGHTING (EXT) › LIGHTING SYSTEM

LIGHTING SYSTEM > Front Fog Light Circuit

for Preparation Click here


DESCRIPTION

The main body ECU (network gateway ECU) receives headlight dimmer switch information signals, and illuminates the front fog light.

WIRING DIAGRAM


E247171E01


INSPECTION PROCEDURE

HINT:
Inspect the fuses and bulbs for circuits related to this system before performing the following inspection procedure.

1.PERFORM ACTIVE TEST USING GTS (FR FOG RELAY)
  1. Connect the GTS to the DLC3.

  1. Turn the ignition switch to ON.

  1. Turn the GTS on.

  1. Enter the following menus: Body Electrical / Main Body / Active Test

  1. Check that the relay operates.

    Main Body 
    Tester Display
    Test Part
    Control Range
    Diagnostic Note
    Front Fog Light Relay
    Front fog light relay
    ON/OFF
    Light control switch is in TAIL position

    OK:
    Front fog light relay operates (front fog lights come on).

    Result :
    Result
    Proceed to
    NG
    A
    OK
    B



B
REPLACE MAIN BODY ECU (NETWORK GATEWAY ECU) (Click here)
A


2.INSPECT INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY
  1. Remove the instrument panel junction block assembly (Click here).

  1. Remove the main body ECU (network gateway ECU) from the instrument panel junction block assembly.

  1. Measure the voltage according to the value(s) in the table below.


E219837E02


Text in Illustration 
*a
Component without harness connected
(Instrument Panel Junction Block Assembly)
-
-

Standard Voltage:

Tester Connection
Condition
Specified Condition
MB-30 (FFGO) - Battery negative (-) terminal
Connect a positive (+) lead from the battery → 3E-1
Connect a negative (-) lead from the battery → MB-7 (TRLY)
11 to 14 V
3C-3 - Battery negative (-) terminal
Connect a positive (+) lead from the battery → 3E-1
Connect a negative (-) lead from the battery → MB-7 (TRLY), MB-30 (FFGO)
11 to 14 V
3C-5 - Battery negative (-) terminal
Connect a positive (+) lead from the battery → 3E-1
Connect a negative (-) lead from the battery → MB-7 (TRLY), MB-30 (FFGO)
11 to 14 V



NG
REPLACE INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY (Click here)
OK

PROCEED TO NEXT SUSPECTED AREA SHOWN IN PROBLEM SYMPTOMS TABLE (Click here)