Home › Engine / Hybrid System › FA20 EMISSION CONTROL › PCV VALVE

PCV VALVE > INSTALLATION

for Preparation Click here



1. INSTALL PCV VALVE SUB-ASSEMBLY


    A092670E01
  1. Apply adhesive to 2 or 3 threads of the PCV valve sub-assembly.

    Adhesive:
    Three Bond 1141G or equivalent

  1. Using a 19 mm deep socket wrench, install the PCV valve sub-assembly.

    Torque:
    23 N*m{ 235 kgf*cm , 17 ft.*lbf }

  1. Connect the ventilation hose.



2. INSTALL INTAKE MANIFOLD
(Click here)