Home › Engine / Hybrid System › 3SZ-VE ENGINE CONTROL › ECM(for RHD) › 2011.11–2015.08
RM19Y0E _51 Engine / Hybrid System _002968 3SZ-VE ENGINE CONTROL _0014975 ECM(for RHD) A

3SZ-VE ENGINE CONTROL  ECM(for RHD)  REMOVAL  


PROCEDURE

Hide 55501A 1.REMOVE GLOVE COMPARTMENT DOOR SUB-ASSEMBLY

Hide 55642 2.REMOVE NO. 2 INSTRUMENT PANEL UNDER COVER

Hide 89561 3.REMOVE ECM

a.

for Type A

i.

Using a centering punch, mark the center of the 4 tapered-head bolts.


ii.

Using a 3 to 4 mm (0.12 to 0.16 in.) drill, drill a hole in the 4 bolt heads.


iii.
A268116

Using a screw extractor, remove the 4 bolts and ECM bracket.


iv.
A268951

Remove the bolt.


v.
A268117

Disconnect the 3 connectors.


vi.

Remove the 2 bolts.



b.

for Type B

i.
A261430

Disconnect the 3 connectors.


ii.

Remove the 2 bolts.



Hide 89539D 4.REMOVE ECM BRACKET

a.

for Type A

i.

Using a centering punch, mark the center of the 2 tapered-head bolts.


ii.

Using a 3 to 4 mm (0.12 to 0.16 in.) drill, drill a hole in the 2 bolt heads.


iii.
A268118

Using a screw extractor, remove the 2 bolts and ECM bracket.


iv.
A268884

Disengage the 2 guides and remove the ECM bracket from the ECM.



b.

for Type B

i.
A266676

Disengage the 2 guides and remove the ECM bracket from the ECM.