Home › Power Source / Network › POWER DISTRIBUTION › MAIN BODY ECU(for LHD) › from 2015.08
RM19Y0E _57 Power Source / Network _041460 POWER DISTRIBUTION _0192576 MAIN BODY ECU(for LHD) A

POWER DISTRIBUTION  MAIN BODY ECU(for LHD)  INSTALLATION  


PROCEDURE

Hide 82600 1.INSTALL FUSE BLOCK ASSEMBLY

a.

Connect the each connector.

NOTICE:

Be sure to connect the connector securely.



b.

Engage the 3 clamps.


c.

Connect the connector and raise lock lever to engage claw and lock the connector.

NOTICE:

Be sure to connect the connectors securely.



d.

Connect the each connector and engage the clamp.

NOTICE:

Be sure to engage the connector securely.



e.

Install the fuse block assembly with the bolt.

Torque:
5.0 N*m (51 kgf*cm, 44 in.*lbf)


Hide 82673B 2.INSTALL JUNCTION BLOCK BRACKET

a.

Install the junction block bracket with 2 bolts.

Torque:
5.0 N*m (51 kgf*cm, 44 in.*lbf)


Hide 55501A 3.INSTALL GLOVE COMPARTMENT DOOR SUB-ASSEMBLY

Hide 4.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

Torque:
6.4 N*m (65 kgf*cm, 56 in.*lbf)

NOTICE:

When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

Click hereGeneral>INTRODUCTION>REPAIR INSTRUCTION>INITIALIZATION