Home › Power Source / Network › 2NR-VE BATTERY / CHARGING › GENERATOR › from 2015.08
RM19Y0E _57 Power Source / Network _041459 2NR-VE BATTERY / CHARGING _0192574 GENERATOR A

2NR-VE BATTERY / CHARGING  GENERATOR  INSTALLATION  


PROCEDURE

Hide 27020 1.INSTALL GENERATOR ASSEMBLY

A363373E01
0.771,0.333 0.927,0.531 0.156,0.198 10 false A 1.385,1.948 1.604,2.135 0.219,0.188 10 false B

a.

Install the generator assembly with the 2 bolts.

Torque:
Bolt A : 44 N*m (449 kgf*cm, 32 ft.*lbf)
Bolt B : 34 N*m (347 kgf*cm, 25 ft.*lbf)


b.

Connect the connector.


c.

Connect the wire harness to terminal B and install the nut.

Torque:
7.9 N*m (80 kgf*cm, 70 in.*lbf)


Hide 16361A 2.INSTALL FAN AND GENERATOR V BELT

Hide 3.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

Torque:
6.4 N*m (65 kgf*cm, 56 in.*lbf)