Home › Power Source / Network › POWER DISTRIBUTION › INTEGRATION RELAY › 2019.09–2020.08
RM32K0E _57 Power Source / Network _061291 POWER DISTRIBUTION _0299565 INTEGRATION RELAY A

POWER DISTRIBUTION  INTEGRATION RELAY  INSTALLATION  


PROCEDURE

Hide 82641 1.INSTALL NO. 1 INTEGRATION RELAY

a.

Connect the 2 connectors.


b.
E353737C01
0,0 0,0 false
V113147

Install in this Direction


Engage the claws to install the No. 1 integration relay as shown in the illustration.


Hide 82662A 2.INSTALL NO. 1 RELAY BLOCK COVER

a.
E353733C01
0,0 0,0 false
V113147

Install in this Direction


Engage the claws to install the No. 1 relay block cover as shown in the illustration.


Hide 3.CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL


NOTICE:

When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

Click hereGeneral>INTRODUCTION>REPAIR INSTRUCTION>INITIALIZATION