Home › Engine / Hybrid System › 3ZR-FAE (INTAKE / EXHAUST) › INTAKE MANIFOLD
RM32H0E _51 Engine / Hybrid System _059727 3ZR-FAE INTAKE / EXHAUST _0292822 INTAKE MANIFOLD A

3ZR-FAE INTAKE / EXHAUST  INTAKE MANIFOLD  INSTALLATION  


PROCEDURE

Hide 1.INSTALL STUD BOLT (w/ Stud Bolt)

HINT:

If a stud bolt is deformed or the threads are damaged, replace it.


a.
A308392

Using an E6 "TORX" socket wrench, install the 2 stud bolts to the intake manifold.

Torque:
5.0 N*m (51 kgf*cm, 44 in.*lbf)


Hide 17177 2.INSTALL NO. 1 INTAKE MANIFOLD TO HEAD GASKET

a.

Install a new No. 1 intake manifold to head gasket to the intake manifold.


Hide 17111 3.INSTALL INTAKE MANIFOLD

a.

Install the wire harness clamp bracket to the intake manifold with the bolt.

Torque:
15 N*m (153 kgf*cm, 11 ft.*lbf)


b.

Install the bolt to the intake manifold.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


c.
A308439C01
1.802,1.313 2.271,1.625 2.271,1.625 2.438,1.625 true 1.688,1.146 2.167,0.198 2.167,0.198 2.385,0.198 true 2.427,0.083 2.74,0.281 0.313,0.198 10 false *a 2.479,1.542 2.792,1.74 0.313,0.198 10 false *b
*a Tip of No. 2 Generator Bracket Set Bolt
*b Intake Manifold Set Bolt


Temporarily install the intake manifold stay and intake manifold with the 4 bolts and 2 nuts.

HINT:

If the intake manifold set bolt cannot be tightened to the specified torque because the tip of the No. 2 generator bracket set bolt is in the way, remove the V-ribbed belt first.

Click herePower Source / Network>3ZR-FAE (BATTERY / CHARGING)>GENERATOR>REMOVAL



d.
A319553C01
0.875,0.052 1.052,0.219 0.177,0.167 10 true *2 0.083,0.229 0.26,0.396 0.177,0.167 10 true *1 1.438,0.135 1.615,0.302 0.177,0.167 10 true *1 1.99,0.042 2.167,0.208 0.177,0.167 10 true *2 2.781,0.26 2.958,0.427 0.177,0.167 10 true *1 2.885,1.49 3.063,1.656 0.177,0.167 10 true *1
*1 Bolt
*2 Nut


Tighten the 4 bolts and 2 nuts to the specified torque in several steps.

Torque:
28 N*m (286 kgf*cm, 21 ft.*lbf)


e.

Connect the engine wire to the wire harness clamp bracket with the nut.

Torque:
8.0 N*m (82 kgf*cm, 71 in.*lbf)


f.

Engage the 2 wire harness clamps to the intake manifold.


Hide 12261 4.CONNECT VENTILATION HOSE

a.

Connect the ventilation hose to the intake manifold and slide the clip to secure it.


Hide 23826 5.CONNECT NO. 1 FUEL VAPOR FEED HOSE

a.

Connect the No. 1 fuel vapor feed hose to the intake manifold.


Hide 89426 6.INSTALL VACUUM SENSOR BRACKET

a.

Install the vacuum sensor bracket to the intake manifold with the bolt.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


b.

Connect the No. 1 air hose assembly to the intake manifold.


c.

Engage the 2 wire harness clamps to the vacuum sensor bracket.


d.

Engage the wire harness clamp to the intake manifold.


Hide 89421 7.INSTALL VACUUM SENSOR ASSEMBLY (MANIFOLD ABSOLUTE PRESSURE SENSOR)

Hide 22210 8.INSTALL THROTTLE BODY ASSEMBLY

Hide 9.INSPECT INTAKE SYSTEM

HINT:

Perform Inspection After Repair after repairing any vacuum leaks in the intake system.

Click hereEngine / Hybrid System>3ZR-FAE (INTAKE / EXHAUST)>INTAKE SYSTEM>ON-VEHICLE INSPECTION