2006-2011 Camry Aurion · Service Manual ENGINE

INSTALLATION

Removal / installation · Vehicles built Jun 2006 – Sep 2006

Versions by build date: Jun 2006 – Sep 2006 Oct 2006 – May 2009 from Jun 2009


1. INSTALL NO. 2 CHAIN SUB-ASSEMBLY

  1. B011424
    Set the crankshaft key into the left horizontal position.

  1. Turn the drive shaft so that the cutout faces upward.

  1. A094198E07
    Align the yellow mark links with the timing marks of each gear as shown in the illustration.

  1. Install the gears onto the crankshaft and oil pump shaft with the chain on the gears.

  1. Temporarily tighten the oil pump drive shaft gear with the nut.

  1. A090851E03
    Insert the damper spring into the adjusting hole, and then install the chain tensioner plate with the bolt.

    Torque:
    12 N*m{ 122 kgf*cm , 9 ft.*lbf }

  1. A052512E02
    Align the adjusting hole of the oil pump drive shaft gear with the groove of the oil pump.

  1. Insert a 4 mm diameter bar into the adjusting hole of the oil pump drive shaft gear to lock the gear in position, and then tighten the nut.

    Torque:
    30 N*m{ 301 kgf*cm , 22 ft.*lbf }

  1. A036525
    Rotate the crankshaft clockwise 90°, and position the crankshaft key to face up as shown in the illustration.


2. INSTALL CRANKSHAFT TIMING SPROCKET

  1. A125374
    Install the crankshaft timing sprocket.


3. INSTALL NO. 1 CHAIN VIBRATION DAMPER

  1. A132570
    Install the chain vibration damper with the 2 bolts.

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }


4. INSTALL CHAIN SUB-ASSEMBLY

  1. A053018E05
    Set the No. 1 cylinder to TDC/compression.

    1. Turn the camshafts with a wrench (using the hexagonal lobe) to align the timing marks of the camshaft timing gear with each timing mark located on the No. 1 and No. 2 bearing caps as shown in the illustration.

      NOTICE:
      Make sure that the timing mark of the No.2 bearing cap is aligned with the timing mark as the Type B camshaft sprocket has several other marks.


      A361177E01

    2. A052505
      Using the crankshaft pulley bolt, turn the crankshaft to position the crankshaft key to face up as shown in the illustration.

  1. A094576E01
    Install the chain onto the crankshaft timing sprocket with the gold or pink mark link aligned with the timing mark on the crankshaft.

  1. A098369E01
    Using SST and a hammer, tap in the crankshaft timing sprocket.
    SST
    09309-37010  

  1. A098370E01
    Align the gold or yellow mark link with each timing mark located on the camshaft timing gear and sprocket, then install the chain.

  1. NOTICE:
    Make sure that the mark link of the chain is aligned with the timing mark as the Type B camshaft sprocket has several other marks.


    A361177E01


5. INSTALL CHAIN TENSIONER SLIPPER

  1. A124787E01
    Install the chain tensioner slipper with the bolt.

    Torque:
    19 N*m{ 194 kgf*cm , 14 ft.*lbf }


6. INSTALL TIMING CHAIN GUIDE

  1. A125373
    Install the timing chain guide with the bolt.

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }


7. INSTALL NO. 1 CRANKSHAFT POSITION SENSOR PLATE

  1. A124770
    Install the sensor plate with the "F" mark facing forward.


8. INSTALL TIMING CHAIN CASE OIL SEAL

  1. A128223E03
    Using SST, tap in a new oil seal until its surface is flush with the timing chain cover edge.
    SST
    09223-22010  

  1. Apply a light coat of MP grease to the lip of the oil seal.

    NOTICE:
    Keep the gap between the timing chain cover edge and the oil seal free of foreign matter.


9. INSTALL TIMING CHAIN COVER SUB-ASSEMBLY
  1. Remove any old packing (FIPG) material and be careful not to drop any oil on the contact surfaces of the timing chain cover, cylinder head and cylinder block.

  1. A140776E01
    Apply seal packing (diameter: 4.0 to 4.5 mm (0.157 to 0.177 in.)) as shown in the illustration.

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or Equivalent

  1. Apply seal packing in a continuous bead as shown in the illustration.

    A132566E03

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or Equivalent

    NOTICE:
    1. Remove any oil from the contact surface.
    1. Install the chain cover within 3 minutes after applying seal packing.
    1. Do not start the engine for at least 2 hours after installing.

  1. A128178E01
    Install the timing chain cover with the 12 bolts and 2 nuts.

    Torque:
    Bolt A:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }
    Bolt B:
    25 N*m{ 255 kgf*cm , 18 ft.*lbf }
    Bolt C:
    55 N*m{ 561 kgf*cm , 41 ft.*lbf }
    Nut:
    11 N*m{ 112 kgf*cm , 8 ft.*lbf }

    Bolt length 
    Item
    Length
    Bolt A
    30 mm (1.18 in.) length for 10 mm head
    Bolt B
    30 mm (1.18 in.) length for 12 mm head
    Bolt C
    40 mm (1.57 in.) length for 14 mm head

  1. Using a E10 "torx" socket, install the stud bolt to the drive belt tensioner.

    Torque:
    22 N*m{ 220 kgf*cm , 16 ft.*lbf }


10. INSTALL V-RIBBED BELT TENSIONER ASSEMBLY

  1. A112212
    Install the V-ribbed belt tensioner with the bolt and nut.

    Torque:
    60 N*m{ 607 kgf*cm , 44 ft.*lbf }

    NOTICE:
    Do not lift the engine more than necessary.


11. INSTALL ENGINE MOUNTING BRACKET RH

  1. A052481
    Install the engine mounting bracket RH with the 3 bolts.

    Torque:
    54 N*m{ 551 kgf*cm , 40 ft.*lbf }


12. INSTALL ENGINE MOUNTING INSULATOR

  1. A059900E02
    Raise the engine and install the engine mounting insulator RH.

  1. Install the engine mounting insulator RH with the 4 nuts.

    Torque:
    Nut A:
    95 N*m{ 969 kgf*cm , 70 ft.*lbf }
    Nut B:
    87 N*m{ 888 kgf*cm , 64 ft.*lbf }

  1. A138332
    Install the steering gear return tube clamps to the frame with the 2 bolts.

    Torque:
    8.0 N*m{ 80 kgf*cm , 69 in.*lbf }

  1. A059880
    Install the engine mounting insulator FR with the bolt.

    Torque:
    87 N*m{ 888 kgf*cm , 64 ft.*lbf }

  1. A060825
    For manual transaxle:
    Install the engine lateral control rod with the bolt.

    Torque:
    89 N*m{ 910 kgf*cm , 66 ft.*lbf }


13. REMOVE ENGINE HANGERS

14. INSTALL OIL PAN SUB-ASSEMBLY

  1. A114332E01
    Remove any old packing material and be careful not to drop any oil on the contact surfaces of the cylinder block and oil pan.

  1. Apply a continuous bead of seal packing (Diameter 3.0 to 4.0 mm (0.118 to 0.157 in.)) as shown in the illustration.

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

    NOTICE:
    1. Remove any oil from the contact surfaces.
    2. Install the oil pan within 3 minutes after applying seal packing.
    3. Do not start the engine for at least 2 hours after installing the oil pan.

  1. Install the oil pan to the cylinder block.

  1. A114333E01
    Uniformly tighten the 12 bolts and 2 nuts in the sequence shown in the illustration.

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }


15. INSTALL CRANKSHAFT POSITION SENSOR

  1. A095436E01
    Apply a light coat of engine oil to the O-ring on the crankshaft position sensor.

  1. A116845E01
    Install the crankshaft position sensor with the bolt.

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }

  1. Connect the crankshaft position sensor connector.


16. INSTALL CRANKSHAFT PULLEY
  1. Align the pulley set key with the key groove of the pulley.

  1. A013697E03
    Using SST, hold the pulley in place and tighten the bolt.
    SST
    09213-54015   (91651-60855)
    09330-00021  

    Torque:
    180 N*m{ 1,835 kgf*cm , 133 ft.*lbf }


17. INSTALL NO. 1 CHAIN TENSIONER ASSEMBLY

  1. A098376E03
    Release the ratchet pawl, then fully push in the plunger and put the hook to the pin so that the plunger is in the position shown in the illustration.

  1. A098377E03
    Install a new gasket and the chain tensioner with the 2 nuts.

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }

    NOTICE:
    If the hook releases the plunger while the chain tensioner is being installed, set the hook again.

  1. A112204E02
    Turn the crankshaft counterclockwise, then disconnect the plunger knock pin from the hook.

  1. A112205E02
    Turn the crankshaft clockwise, then check that the plunger is extended.


18. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY
  1. Remove any old packing material from the contact surface.

  1. A094205E01
    Apply seal packing to the 2 locations shown in the illustration.

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

    NOTICE:
    1. Remove any oil from the contact surface.
    2. Install the cylinder head cover within 3 minutes of applying seal packing.
    3. Do not add engine oil for at least 2 hours after installing the cylinder head cover.

  1. A127550E01
    Install the cylinder head cover with the 8 bolts and 2 nuts.

    Torque:
    Bolt A:
    11 N*m{ 112 kgf*cm , 8 ft.*lbf }
    Bolt B:
    14 N*m{ 143 kgf*cm , 10 ft.*lbf }
    Nut:
    11 N*m{ 112 kgf*cm , 8 ft.*lbf }

  1. A112210
    Install the 2 engine wires with the 2 bolts.

    Torque:
    8.4 N*m{ 86 kgf*cm , 74 in.*lbf }


19. INSTALL NO. 2 VENTILATION HOSE

20. INSTALL VENTILATION HOSE

21. INSTALL IGNITION COIL ASSEMBLY
  1. Install the 4 ignition coils with the 4 bolts.

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }


22. INSTALL VANE PUMP ASSEMBLY

  1. A059879
    Install the vane pump to the engine with the 2 bolts.

    Torque:
    43 N*m{ 439 kgf*cm , 32 ft.*lbf }

  1. Connect the oil pressure switch connector.


23. INSTALL GENERATOR ASSEMBLY

  1. A097394E03
    Confirm that the wire harness of the crankshaft position sensor is secured to the wire harness clamp bracket through the back of the rib of the timing chain cover.

  1. A142104E01
    Install the generator assembly with the 2 bolts.

    Torque:
    Bolt A:
    21 N*m{ 215 kgf*cm , 16 ft.*lbf }
    Bolt B:
    52 N*m{ 530 kgf*cm , 38 ft.*lbf }

  1. A135170
    Install the generator wire to terminal B with the nut.

    Torque:
    9.8 N*m{ 100 kgf*cm , 87 in.*lbf }

  1. Install the clamp bracket with the bolt.

    Torque:
    8.4 N*m{ 86 kgf*cm , 74 in.*lbf }

  1. Attach the clamp and connect the generator connector to the generator.


24. INSTALL V-RIBBED BELT

  1. A114351E03
    Using SST and a 19 mm socket wrench, loosen the V-ribbed belt tensioner arm clockwise, then install the V-ribbed belt.
    SST
    09216-42010  

    NOTICE:
    1. Be sure to connect SST and the tools so that they are in line during use.
    2. When retracting the tensioner, turn it clockwise slowly for 3 seconds or more. Do not apply force rapidly.
    3. After the tensioner is fully retracted, do not apply more force than necessary.

  1. After installing the V-ribbed belt, check that it fits properly in the ribbed grooves. Check to confirm that the belt has not slipped out of the grooves on the bottom of the crank pulley by hand.


25. INSTALL NO. 2 ENGINE MOUNTING BRACKET RH

  1. A134911
    Install the No. 2 engine mounting bracket RH with the 3 bolts.

    Torque:
    52 N*m{ 531 kgf*cm , 38 ft.*lbf }


26. INSTALL ENGINE MOVING CONTROL ROD SUB-ASSEMBLY

  1. A134910
    Install the engine moving control rod with the 3 bolts.

    Torque:
    64 N*m{ 653 kgf*cm , 47 ft.*lbf }

  1. A134909
    Install the ground cable with the bolt.

    Torque:
    8.4 N*m{ 85 kgf*cm , 74 in.*lbf }


27. INSTALL NO. 2 ENGINE MOUNTING STAY RH

  1. A134912
    Install the No. 2 engine mounting stay RH with the 2 bolts.

    Torque:
    64 N*m{ 653 kgf*cm , 47 ft.*lbf }


28. INSTALL FRONT EXHAUST PIPE ASSEMBLY

HINT:
Click here.


29. ADD ENGINE OIL

30. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

Torque:
6.9 N*m{ 70 kgf*cm , 61 in.*lbf }


31. INSPECT FOR ENGINE OIL LEAKS

32. INSPECT FOR EXHAUST GAS LEAK

33. INSPECT IGNITION TIMING
  1. Warm up the engine.

  1. C139987E06
    When using the intelligent tester:
    Check the ignition timing.

    1. Connect the intelligent tester to the DLC3.

    2. Enter DATA LIST MODE on the intelligent tester.

      Ignition timing:
      8 to 12° BTDC at idle

      HINT:
      Refer to the intelligent tester operator's manual for help when selecting the DATA LIST.

  1. A082779E69
    When not using the intelligent tester:
    Check the ignition timing.

    1. Using SST, connect terminals 13 (TC) and 4 (CG) of the DLC3.

      SST
      09843-18040  

      NOTICE:
      1. Confirm the terminal numbers before connecting them. Connection with a wrong terminal can damage the electrical system.
      2. Turn off all electrical systems before connecting the terminals.
      3. Perform this inspection after the cooling fan motor has turned off.

    2. A052004
      Remove the No. 1 engine cover.

    3. Pull out the wire harness as shown in the illustration. Connect the clip of the timing light to the wire harness.

      NOTICE:
      1. Use a timing light which can detect the first signal.
      2. After checking, be sure to tape the wire harness.

    4. Check the ignition timing at idle.

      Ignition timing:
      8 to 12° BTDC at idle

      NOTICE:
      When checking the ignition timing, the transmission should be in neutral.

      HINT:
      After the engine rpm is kept at 1,000 to 1,300 rpm for 5 seconds, check that it returns to idle speed.

    5. Disconnect terminals 13 (TC) and 4 (CG) of the DLC3.

    6. Check the ignition timing at idle.

      Ignition timing:
      5 to 15° BTDC at idle

    7. Confirm that the ignition timing moves to the advanced angle side when the engine rpm is increased.

    8. Remove the timing light.

    9. Install the No. 1 engine cover.


34. INSTALL FRONT FENDER APRON SEAL RH

35. INSTALL ENGINE UNDER COVER LH

36. INSTALL ENGINE UNDER COVER RH

37. INSTALL FRONT WHEEL RH

38. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY

  1. A134904
    Install the engine cover with the 2 nuts.

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }

← INSPECTION (from Jun 2009)INSTALLATION (Oct 2006 – May 2009) →