Reverse Signal Circuit
Circuit diagnosis · Vehicles built from Jun 2009
DESCRIPTION
The navigation receiver assembly receives the reverse signal from the park/neutral position switch assembly.WIRING DIAGRAM


INSPECTION PROCEDURE
| 1. CHECK NAVIGATION RECEIVER ASSEMBLY (REVERSE SIGNAL INPUT) |
Disconnect the F13 connector from the navigation receiver assembly.
Measure the voltage according to the value(s) in the table below.
- Standard Voltage:
Tester Connection
Condition
Specified Condition
F13-5 (REV) - Body ground
Ignition switch on (IG), shift lever in R
7 V or higher
|
|
||||
| OK | ||
| ||
| 2. CONFIRM MODEL |
Choose the model to be inspected.
- Result:
Model
Proceed to
for 2AZ-FE
A
for 2GR-FE
B
|
|
||||
| A | |
| 3. CHECK HARNESS AND CONNECTOR (NAVIGATION RECEIVER ASSEMBLY - PARK/NEUTRAL POSITION SWITCH) |
Disconnect the F13 connector from the navigation receiver assembly.
Disconnect the C1 connector from the park/neutral position switch assembly.
Measure the resistance according to the value(s) in the table below.
- Standard Resistance:
Tester Connection
Condition
Specified Condition
F13-5 (REV) - C1-1 (RL)
Always
Below 1 Ω
F13-5 (REV) - Body ground
Always
10 kΩ or higher
|
|
||||
| OK | |
| 4. INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY |
Remove the park/neutral position switch assembly (Click here).
Measure the resistance according to the value(s) in the table below.

- Standard Resistance:
Tester Connection
Condition
Specified Condition
1 (RL) - 2 (RB)
Shift lever in R
Below 1 Ω
1 (RL) - 2 (RB)
Shift lever in any position except R
10 kΩ or higher
Text in Illustration *1
Component without harness connected
(Park/Neutral Position Switch Assembly)
|
|
||||
| OK | ||
| ||
| 5. CHECK HARNESS AND CONNECTOR (NAVIGATION RECEIVER ASSEMBLY - PARK/NEUTRAL POSITION SWITCH) |
Disconnect the F13 connector from the navigation receiver assembly.
Disconnect the C1 connector from the park/neutral position switch assembly.
Measure the resistance according to the value(s) in the table below.
- Standard Resistance:
Tester Connection
Condition
Specified Condition
F13-5 (REV) - C1-2 (RL)
Always
Below 1 Ω
F13-5 (REV) - Body ground
Always
10 kΩ or higher
|
|
||||
| OK | |
| 6. INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY |
Remove the park/neutral position switch assembly (Click here).
Measure the resistance according to the value(s) in the table below.

- Standard Resistance:
Tester Connection
Condition
Specified Condition
2 (RL) - 1 (RB)
Shift lever in R
Below 1 Ω
2 (RL) - 1 (RB)
Shift lever in any position except R
10 kΩ or higher
Text in Illustration *1
Component without harness connected
(Park/Neutral Position Switch Assembly)
|
|
||||
| OK | ||
| ||
