REMOVAL
Removal / installation · Vehicles built from Jun 2009
Versions by build date: Oct 2006 – May 2009 from Jun 2009
| 1.
REMOVE ENGINE UNDER COVER LH |
|
| 2.
REMOVE ENGINE UNDER COVER RH |
|
| 3.
DRAIN AUTOMATIC TRANSAXLE FLUID
|
 |
- Remove the refill plug and gasket.
- Using a 6 mm socket hexagon wrench, remove the overflow plug and gasket.
- Using a 6 mm socket hexagon wrench, remove the No. 1 transmission oil filler tube.
Drain the automatic transaxle fluid.
- Using a 6 mm socket hexagon wrench, install the No. 1 transmission oil filler tube.
-
Torque:
- 1.7 N*m{
17 kgf*cm
, 15 in.*lbf
}
- Using a 6 mm socket hexagon wrench, install the overflow plug with a new gasket.
-
Torque:
- 40 N*m{
408 kgf*cm
, 30 ft.*lbf
}
- Install the refill plug with a new gasket.
-
Torque:
- 49 N*m{
500 kgf*cm
, 36 ft.*lbf
}
| 4.
REMOVE AIR COOLED OIL COOLER |
 |
- Disconnect the 2 oil cooler hoses.
Remove the bolt, 2 nuts, and the air cooled oil cooler.